settlement and load transfer mechanism of pile group due to side-by-side twin tunnelling.pdfVIP

  • 11
  • 0
  • 约14.92万字
  • 约 15页
  • 2016-03-12 发布于广东
  • 举报

settlement and load transfer mechanism of pile group due to side-by-side twin tunnelling.pdf

settlement and load transfer mechanism of pile group due to side-by-side twin tunnelling

Computers and Geotechnics 64 (2015) 105–119 Contents lists available at ScienceDirect Computers and Geotechnics journal homepage: www.elsevi /locate/compgeo Research Paper Settlement and load transfer mechanism of pile group due to side-by-side twin tunnelling Y. Hong b, M.A. Soomro a,⇑, C.W.W. Ng c a Department of Civil Engineering, The Quaid-e-Awam Universi

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档