ARIES-AT Maintenance System Definition and Analysis.docVIP

ARIES-AT Maintenance System Definition and Analysis.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ARIES-AT Maintenance System Definition and Analysis.doc

Design Approach of the ARIES-AT Power Core By Lester M. Waganer1, Farrokh Najmabadi2, Mark Tillack2, and Xueren Wang2 (1) The Boeing Company, St. Louis, MO (2) University of California - San Diego, San Diego, CA and The ARIES Team Abstract The complexity of fusion power plant requires the integration of many diverse and important system requirements to achieve a design approach that would be viewed as a viable commercial electrical generating plant. The ARIES-AT power core design builds upon a history of fusion power core designs that have evolved along with physics and engineering advances. The baseline design point is optimized for maximum performance and minimum capital cost based upon the ARIES Systems Code results and physics and engineering analyses. To achieve high availability, ARIES-AT power core was designed to be quickly and easily maintainable. Power Core Design Philosophy In recent years, improved physics understanding of advanced plasma confinement modes have lead to more efficient power core configurations. The ARIES-RS1 design reflected many of these improvements, but the ARIES-AT2 incorporates several new plasma and engineering improvements. L. Waganer conducted an analysis that concluded the power core maintenance approach3 that extracted a complete power core sector and replaced it with a refurbished one from the plant hot cell was the most reliable and expedient core maintenance approach. This design approach was also used in the ARIES-RS power core design4. Extracting a complete power core sector requires placement of the poloidal field (PF) coils in regions above and below the horizontal location of the removable power core sector components. Additionally, all other systems, such as the vacuum pumping ports and RF or neutral beam systems, must be moved away from this region. Moreover, the toroidal field (TF) coils must be enlarged to provide adequate clearance between the coils to extract a complete power core sector. In deviating fr

文档评论(0)

1983987115 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档