- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * * * * * * * Fiber cores are ropes made from fibers formed into yarns, then into strands and finally into the finished core form. There are two general types of fiber: natural vegetable material, such as sisal, manila and cotton and synthetic filaments, such as polypropylene or polyethylene. Steel cores may be an independent wire rope (IWRC) or, in the case of small diameter ropes and some rotation-resistant ropes, a wire strand core (WSC). These steel cores provide more support than fiber cores to the outer strands during the rope’s operating life. Steel cores resist crushing, are more resistant to heat, reduce the amount of stretch, and increase the strength of the rope. * In regular lay ropes, the wires in the strands are laid in one direction, while the strands in the rope are laid in the opposite direction. The result is that the wire crown runs approximately parallel to the longitudinal axis of the rope. These ropes have good resistance to kinking and twisting and are easy to handle. They are also able to withstand considerable crushing and distortion due to the short length of exposed wires. This type of rope has the widest range of applications. * The reason for left hand or right hand lay is to accommodate the different winch designs from various manufacturers. The end of the winch to which the rope is anchored and the direction of winch loading each effect the decision of which lay is the correct lay. The incorrect lay will result in rapid wear of the rope, increased number of broken wires and difficulty in maintaining an orderly laying of the rope onto the winch drum. Has any class member ever experienced problems with a FSWR when trying to wind it onto a winch drum? The most probable cause is that it was the wrong direction lay for the winch! * * The responsibility with determining the weight to be lifted cant be shifted onto the crane operator, its too late then. That needs to be determined well in advance to a degree of accuracy commensurate w
您可能关注的文档
最近下载
- 眼外伤ppt课件-眼外伤健康教育课件.ppt VIP
- 《新时代思想读本》3.2新时代新征程课件.pptx VIP
- 2024-2025学年初中信息科技湘教版2024七年级上册-湘教版2024教学设计合集.docx
- 人教鄂教版科学四年级上册全册教学设计教案.doc
- DB11T 945.1-2023建设工程施工现场安全防护、场容卫生及消防保卫标准 第1部分:通则.pdf VIP
- 外研版六年级(上册)M4U2.ppt VIP
- 大学课程思政案例(高校课程思政案例)-思政案例内容整理.docx VIP
- 《无人机综合监管与航路规划》全套教学课件.pptx VIP
- (优质!)Amfori BSCI社会责任验厂全套管理手册及程序文件.docx VIP
- 自-电大__电工电子技术总复习题及答案 .doc VIP
文档评论(0)