金海岸宾馆建筑给水排水工程设计要点.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科毕业设计(论文) 题目: 院 (系): 专 业: 班 级: 学 生: 学 号: 指导教师: 2013年 月 Gold Coast Hotel building water supply and drainage engineering design Abstract The main contents of the gold coast hotel building water supply and drainage engineering design include: building water supply system, drainage system, hot water system and building fire system design. The building has two floors underground, seventeen floors on the ground . The first to the sixth floor are Non-standard layer; The seventh to the seventeenth are standard layer. The municipal water supply piping to provide capital with the head of 0.34MPa, After the comparison of technicality and economy,interior water supply system using subarea water supply mode. The building water supply system is divided into two areas: underground two floors to the six floors are low area; the seven floors to the seventeen floors are high area. After comprehensive consideration, high and low area pressure water supply by frequency conversion pump , municipal pressure water for car wash water and other. The building drainage system adopt confluence, the collection of discharge pipe, wherein the restaurant drainage by oil separation tank discharge treatment. Building hot water system adopts centralized hot water supply, indirect heating, riser loop closed system. To ensure that the water is cold and hot water pressure balance, hot water system and chilled water system adopt the same partition. Hot water pipeline along the water supply pipe laying, up-feed and down-feed , the same program arrangement. Building fire system comprises an indoor hydrant water supply system and automatic sprinkler system, each floor are provided in the indoor fire hydrant, fire elevator room layout to clear the way for the fire and fire hydrant in the roof layout inspection which. Accord

文档评论(0)

创业文库 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档