摘要 本毕业设计是根据甘肃省兰州市兰州交通大学2#学生公寓工程的施工合同、招标文件、招标图纸、施工设计变更图纸、设计变更及现场签证、批价等编制的。本工程主体结构分为两个独立的结构单元。中翼负一层地下室为甲类核六级人防地下室,建筑面积为建筑面积19577.86m2(其中地下:994㎡,地上:18583㎡),建筑基底面积2934.93㎡ Abstract The graduation project is based on the construction contract in Lanzhou City of Gansu Province, tender documents, tender drawings, construction drawings design changes, design changes and site visa, rating and so of Lanzhou Jiaotong University engineering student apartments # 2, prepared. The main structure of the project is divided into two separate structural unit.Wing basement of the CPI minus one core six basement, floor area of building area 19577.86m2 (including underground: 994㎡ ground: 18583㎡), building basement area 2934.93㎡, interior height of 0.03m.The design consists of three parts: The first part of the construction design parts, including the basis for the preparation, project profiles, construction general layout and construction schedule, the main sub-segment of the construction plan, several chapters of the total floorplan overall schedule diagrams.The total duration of the project is planned: June 10, 2014 started May 3, 2015 completed a total duration of 328 calendar days. The second part is bidding section, which mainly uses Glodon reinforced count the amount of software, graphics software, and count the amount of pricing software. According to pre-housing construction decoration engineering calculation norms (GB50854-2013), Bill of Quantities construction specifications (GB50500-2013), Lanzhou project cost information and Lanzhou Construction Cost Guide for a list of the works offer.By calculating the total project cost of 31,651,975.50 yuan. The third part is the preparation of project settlement price, which is applied to the amount of inventory on the basis of some of the major projects and related design changes and other data were compiled. The settlement of tender drawings and construction drawings design changes difference, design changes, visa program and other b

文档评论(0)

boss + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档