- 1、本文档共31页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘要
本毕业设计是根据甘肃省兰州市兰州交通大学2#学生公寓工程的施工合同、招标文件、招标图纸、施工设计变更图纸、设计变更及现场签证、批价等编制的。本工程主体结构分为两个独立的结构单元。中翼负一层地下室为甲类核六级人防地下室,建筑面积为建筑面积19577.86m2(其中地下:994㎡,地上:18583㎡),建筑基底面积2934.93㎡
Abstract
The graduation project is based on the construction contract in Lanzhou City of Gansu Province, tender documents, tender drawings, construction drawings design changes, design changes and site visa, rating and so of Lanzhou Jiaotong University engineering student apartments # 2, prepared. The main structure of the project is divided into two separate structural unit.Wing basement of the CPI minus one core six basement, floor area of building area 19577.86m2 (including underground: 994㎡ ground: 18583㎡), building basement area 2934.93㎡, interior height of 0.03m.The design consists of three parts:
The first part of the construction design parts, including the basis for the preparation, project profiles, construction general layout and construction schedule, the main sub-segment of the construction plan, several chapters of the total floorplan overall schedule diagrams.The total duration of the project is planned: June 10, 2014 started May 3, 2015 completed a total duration of 328 calendar days.
The second part is bidding section, which mainly uses Glodon reinforced count the amount of software, graphics software, and count the amount of pricing software. According to pre-housing construction decoration engineering calculation norms (GB50854-2013), Bill of Quantities construction specifications (GB50500-2013), Lanzhou project cost information and Lanzhou Construction Cost Guide for a list of the works offer.By calculating the total project cost of 31,651,975.50 yuan.
The third part is the preparation of project settlement price, which is applied to the amount of inventory on the basis of some of the major projects and related design changes and other data were compiled. The settlement of tender drawings and construction drawings design changes difference, design changes, visa program and other b
您可能关注的文档
- 跨线桥施工方案(总体)详解.doc
- 跨线现浇梁施工安全专项方案详解.doc
- 跨渝宜高速公路连续梁施工方案详解.doc
- 块地项目可行性分析报告详解.doc
- 快递系统解决方案(标准版报价)详解.doc
- 快热式家用电热水器的设计论文详解.doc
- 快时尚品牌ZARA的营销策略分析详解.doc
- 快速成型技术的发展和应用详解.doc
- 快速成型技术及其在铸造中的应用详解.doc
- 快消品机密培训《销售培训教材》详解.doc
- 中国国家标准 GB/T 28182-2024额定电压52 kV及以下带串联间隙避雷器.pdf
- GB/T 28182-2024额定电压52 kV及以下带串联间隙避雷器.pdf
- 《GB/T 44045-2024石油、石化和天然气工业用转子泵》.pdf
- GB/T 15314-2024精密工程测量规范.pdf
- 中国国家标准 GB/T 15314-2024精密工程测量规范.pdf
- 《GB/T 15314-2024精密工程测量规范》.pdf
- GB/T 33475.2-2024信息技术 高效多媒体编码 第2部分:视频.pdf
- 中国国家标准 GB/T 33475.2-2024信息技术 高效多媒体编码 第2部分:视频.pdf
- 《GB/T 33475.2-2024信息技术 高效多媒体编码 第2部分:视频》.pdf
- GB/T 44045-2024石油、石化和天然气工业用转子泵.pdf
文档评论(0)