* Some operators are utilizing Acid Soluble Cement (ASC) to cement their horizontal casing. The ASC dissolves in the presence of HCl acid creating an excellent flow path from the perforation to the sandface. The toe of the horizontal is opened with a select fire TCP gun in 2-4 perforation clusters spaced 75-150 ft. apart and then are fractured together. These clusters are referred to as a “span”. Each span represents a frac stage and these spans are spaced out between 300-500 ft. and each span is isolated between by a pump down FasDrill (composite) Bridge or Frac Plug. As many as 4-12 s