Lecture_OPMG_07.pptxVIP

  • 3
  • 0
  • 约小于1千字
  • 约 18页
  • 2017-05-16 发布于江西
  • 举报
Lecture_OPMG_07

Lecture 7;Learning Objectives;Moving Products through Operations;Numbering Systems;Numbering Systems;Example: Parallel Numbering Systems;Numbering Systems for Materials;Engineering Drawings;Engineering Drawings;Bills of Material;Product Structure for FMFC LD;;BoM Types;Variant BoM;Variant BoM;Where-Used Lists;Where-used List;A manufacturer detects a defect in his product P which has a critical impact on product safety. Technical analysis shows that the malfunction is localized in the purchased module (B). The supplier of B finds out that it is a purchased part (K) which is responsible for the

文档评论(0)

1亿VIP精品文档

相关文档