- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Ch2C Falts on Power Systems
Chapter 2 Faults on Power Systems
Part 1 Faults and its Damage
Each year new designs of power equipment bring about increased reliability of operation. Nevertheless, equipment failures and interference by outside sources occasionally result in faults on electric power systems. On the occurrence of a fault, current and voltage conditions become abnormal, the delivery of power from the generating stations to the loads may be unsatisfactory over a considerable area, and if the faulted equipment is promptly disconnected from the remainder of the system, damage may result to other pieces of operating equipment.
A fault is the unintentional or intentional connecting together of two or more conductors which ordinarily operate with a difference of potential between them. The connection between the conductors may be by physical metallic contact or it may be through an arc. At the fault, the voltage between the two parts is reduced to zero in the case of metal-to-metal contacts, or to a very low value in case the connection is through an arc. Currents of abnormally high magnitude flow through the network to the point of fault. These short-circuit currents will usually be much greater than the designed thermal ability of the conductors in the lines or machines feeding the fault. The resultant rise in temperature may cause damage by the annealing of conductors and by the charring of insulation. In the period during which the fault is permitted to exist, the voltage on the system in the near vicinity of the fault will be so low that utilization equipment will be inoperative. It is apparent that the power system designer must anticipate points at which faults may occur, be able to calculate conditions that exist during a fault, and provide equipment properly adjusted to open the switches necessary to disconnect the faulted equipment from the remainder of the system. Ordinarily it is desirable that no other switches on the system are opened, as such behavior would result in unne
您可能关注的文档
- 7月自学考试概论与数理统计(经管类)试题和部分答案.doc
- 7月高等教育自考试政治经济学(财经类)真题及答案.doc
- 7月概率论与数统计(经管类)试题答案.doc
- 7月高等教育自考试概率论与数理统计(经管类)04183试题及答案.doc
- 7月高等教育自考试中级财务会计试题及答案n.doc
- 7月高等教育自考试资产评估试卷真题.doc
- 7理论课程教学纲(液压与气压传动).doc
- 7短文两篇(《道树》、《第一次真好》).doc
- 7第七章中小学心理健康与教育练习题答案.doc
- 7第七章共产主是人类最崇高的社会.doc
- Ch14 Mutiple choice.doc
- chap04Uderstanding_Interest_Rates.doc
- chapter pragmatics.doc
- Chapter1 - student study questions.doc
- CentOS系安装MySQL教程.docx
- chap410315习题及参考答案.doc
- Chap007international accounting Doupnik and perara.doc
- Chapter1 Production and Operation Management.doc
- chapter1 The Anglo-Saxon Period.doc
- Chapter1 The Nature of Translation.doc
最近下载
- 2025至2030年中国报废汽车回收拆解行业市场运行现状及投资规划建议报告.docx
- Unit 2 What do you like about your family Period 1 Ready Go & Sound 教学设计 沪教版(2025)二年级英语上册.docx VIP
- 食品添加剂 甲醇钠标准2023年.docx VIP
- 高一语文上学期《乡土中国》-差序格局教学课件.pptx VIP
- 企业安全生产检查标准化表格.doc VIP
- 中成药的临床合理应用试卷含答案.docx
- 《HIV病毒与艾滋病》课件.ppt VIP
- 第二单元第1课《因地制宜》课件-2025-2026学年人教版(2024)八年级上册.pptx VIP
- 高标准农田建设标准NYT2148-2012.pdf VIP
- 世界少年奥林匹克数学竞赛(中国区)选拔赛省级选拔模拟卷(三)三年级试题(含解析)2025年5月夏季.docx VIP
原创力文档


文档评论(0)