沙尾站至石厦站矿法开挖增设临时施工联络通道施工方案.docxVIP

  • 3
  • 0
  • 约7.04千字
  • 约 16页
  • 2017-05-10 发布于贵州
  • 举报

沙尾站至石厦站矿法开挖增设临时施工联络通道施工方案.docx

沙尾站至石厦站矿法开挖增设临时施工联络通道施工方案

pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after taking safety measures, no d, lead on sliding-parameter shutdown process and after approval ratings down compared with (b). Capacity positive differential expansion of b, a, prone to the negative expand difference c, differential expansion does not change d, change little differential expansion turbine shutdown when the coastdown speed, due to the blast and Poissons effect, the rotor will appear (a) sudden increase. A, positive differential expansion of b, negative differential expansion of c, d, differential expansion mutation does not occur. Variable pressure operation of the unit, when the load changes, to (a) high-temperature components to changes in temperature. A and b increased c reduction, will not change d, the dramatic changes in the steam heat transfer between metal and larger metal parts caused by internal temperature (b). Greater the smaller the a, b, c, constant 深圳地铁7号线7303标沙尾站—石厦站矿山法开挖段 增设临时施工联络通道施工方案 编制: 审核: 深圳市东深工程有限公司沙尾站—石厦站矿山法开挖段项目 2013-9-18 沙尾站至石厦站区间矿山法开挖增设临时施工联络通道施工方案 1.编制目的及依据 1.1.编制目的 目前沙尾站至石厦站区间矿山法开挖段已完成开挖

文档评论(0)

1亿VIP精品文档

相关文档