- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
BOT融资模式1q
Project Name: Tang Island Bay Power Plant
Class: International Project Management 102
Group 2:
Group leader: 宋岩磊 张 惠
Group member: 丁学浩 单媛媛 刘亚文
罗贞贞 李超 石婷 唐秀琳 龚代成 贾小林
于亚琦 孙嘉平 班彩力 付正飞 陈志华
Contents
1. Project background ……………………………………… 1
2. Project participants
2.1 The Responsible Person List………………………… 2
2.2 BOT Model Organizational Structure Diagram………3
3. Contract related to the project
3.1 The Contained Contract ……………………………… 4
3.2 Contract Structure Diagram ………………………… 5
4. Investment,Financing and Capital Structure…… 6
5. BOT Financing Pattern
5.1 BOT Financing Model Diagra ………………………… 7
5.2 Responsibilities of the two parties……………… 8
6. Capital Structure
6.1 BOT Model Capital Structure Diagram……………… 9
6.2 source of financing …………………………………… 10
7. Credit Enhancement……………………………… …… 11
8. Appendix ……………………………………………………12
Part 1: Project background
Recently, with the increasingly tight supply of power in Qingdao. Tang Island Bay power plant came into being in order to solve the power shortage problem regionally.
Tang Island Bay power plant is a BOT project and it is so representative in China. Tang Island Bay plant is a large thermal power plant which uses the Engineering -Procurement-Construction way. It will be set out to build On July 15, 2013 officially. And the construction period will be two years.
The total investment is 3 billion dollar. Of which 1.1 billion capital, bank loans 1.3 billion,export credit 0.6 billion.
It is estimated that the installed capacity of power plants is about 2 × 35 million kilowatts. Generators and all electrical equipment are made and provided by Japan equipments Company.
With the advanced equipment and the superior management experiences, Tang Island Bay Power Plant will be accumulated generating 90 billion degrees after coming into operation two decades .It will become one of the main power plant in Qingdao power grid and make a positive contribution to the power grid stability and economic d