翻译—水平定向钻孔底钻具的研究与应用.doc

翻译—水平定向钻孔底钻具的研究与应用.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
翻译—水平定向钻孔底钻具的研究与应用

Horizontal Directional Drill Hole Drill end of the study and application of a drill hole end of a composition and function. 1.Construction of drill hole orientation : drill pipe, a launcher tube and a guide to accommodate bit. Construction of drill hole orientation with drilling, to change, through magnetic and drilling fluid delivery functions. Coordinated by computer control, in strict accordance with the design of the track has been completed oriented hole. Drilling is drilling high pressure liquid jet cutting board and bit accomplished; Bits board and the installation of boards of drilling teeth. Rotary drilling bit at the time supporting Cutting role in promoting the drill pipe at changes to the role; transmitters placed to accommodate tube launcher, to accommodate the opening of a Magnetic planters, Non-metallic materials and sealed to prevent the entry of high pressure drilling fluid, launch vehicles by the electromagnetic field Magnetic tank fired. Internal drill pipe and drill should provide sufficient access to meet the drilling fluid flow needs. 2, the construction of bore hole : drill pipe, the first to expand, the rotary joint drill pipe and back to Rafah. When the guide hole drilling is completed, unloaded oriented bit, to accommodate tube launchers and connect with reverse bore bit and rotary joint, Then after the rotary joint drill pipe connected to Rafah, to Reamer drilling. The large diameter holes, a number of bore drilling, hole diameter gradually expanded to the size requirement. 3, back to Rafah Pipeline Construction hole : drill pipe to Rafah, to expand first, rotating joints and pipe-drawing tools. When the bore drilling is completed, the drill pipe to Rafah after expanding access to the first and rotary joint, After the rotary connector connected pipe-drawing tools and the laying of pipelines to be anti-expansion Pipeline. 2, the main drill a research and application, the drill pipe drilling pipe construction quality is the key to succes

文档评论(0)

woai118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档