网站大量收购独家精品文档,联系QQ:2885784924

‖PS教程‖:你如何做闪光形像照.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
‖PS教程‖:你如何做闪光形像照

1:首先点击最上边的文件2个字,点击打开,选中你要做的图片. 我先拿张照片做一个吧.你们要仔细看哦! 2:打开以后点击图层,然后点复制图层,要点2次哦.就是复制图层2次.↓ 3:然后点击左下角的小3角↓ 4;进入以后点击从图层建立桢↓ 之后就会出现 (如图所示)↓ 然后点击下1帖↓ 5:点击最上边菜单栏中的滤镜.然后在选中渲染,最后点镜头光晕 之后就会出现(如图所示)↓ ↑选中电影镜头,(依个人喜好,你也可以选其他效果)最后确定,第一侦就做好了 6:接下来的第2侦和第1侦的做法一样.↓注意做第2侦的时候点一下这里(如图所示)↓ 做第3侦也是一样的.↑ 注意;↓ 最后我们把做好的图片保存. 最后效果: 有的朋友问我为什么做了51头像就不闪了. 答:你最后保存的时候,最上边的菜单栏中有个图象.进入以后把大小调节成 比例为120.120 然后在上传到51里,在把他设置为头像就闪了 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horiz

文档评论(0)

pab547 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档