- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
本科毕业设计
外文文献及译文
文献、资料题目:Changing roles of the clients
Architects and contractors
Through BIM
文献、资料来源:Engineering, Construction, Archi-
tectual Management
文献、资料发表(出版)日期:2010.2
院 (部): 管理工程学院
专 业:
班 级:
姓 名:
学 号:
指导教师:
翻译日期: 2012.6.3
外文文献:
Changing roles of the clients,architects and contractors through BIM
Rizal Sebastian
TNO Built Environment and Geosciences, Delft, The Netherlands
Abstract
Purpose – This paper aims to present a general review of the practical implications of building information modelling (BIM) based on literature and case studies. It seeks to address the necessity for applying BIM and re-organising the processes and roles in hospital building projects. This type of project is complex due to complicated functional and technical requirements, decision making involving a large number of stakeholders, and long-term development processes.
Design/methodology/approach – Through desk research and referring to the ongoing European research project InPro, the framework for integrated collaboration and the use of BIM are analysed. Through several real cases, the changing roles of clients, architects, and contractors through BIM application are investigated.
Findings – One of the main findings is the identification of the main factors for a successful collaboration using BIM, which can be recognised as “POWER”: product information sharing (P),organisational roles synergy (O), work processes coordination (W), environment for teamwork (E), and reference data consolidation (R). Furthermore, it is also found that the implementation of BIM in hospital building projects is still limited due to certain commercial and legal barriers, as well as the fact that integrated collaboration has not yet been embedded in the real estate strategies of healthcare institutions.
Originality/value – This paper contributes to the actual discussion in science and practice on the changing roles and processes that a
您可能关注的文档
- 2014宁夏银川市第九中学高三上学期第三次考文科综合试卷及答案.doc
- 2014宁夏餐饮业发展规划.doc
- 2014宁德一中关于招收高中体育特长生的方案.doc
- 2014工商管理专业学论文.doc
- 2014工商管理专业本科毕业论文设计选题指南.doc
- 2014工商管理本科.doc
- 2014工商管理本科学位论文.doc
- 2014工商管理本科毕业论文.doc
- 2014工商管理本科毕业论文参考选题.doc
- 2014工商管理本科论文题目及格式参考论文.doc
- 注册验船师高频真题题库2025.docx
- 注册验船师高频题库带解析2025.docx
- 注册验船师考试必备资料2025.docx
- 注册验船师精选题库带分析2025.docx
- 注册验船师考前冲刺必刷题附答案2025.docx
- 新高考生物二轮复习讲练测第10讲 人体的稳态与免疫调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第13讲 生物技术与工程(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第7讲 遗传的基本规律与伴性遗传(检测)(原卷版) .docx
- 新高考生物二轮复习讲练测第13讲 生物技术与工程(检测)(原卷版).docx
文档评论(0)