beam bottom wood square root number: 3
7, wood square section specifications: 50 * 80 mm
8, beam bottom wood square distance: 175 mm
9, small beam bottom bar: phi 48 x 3.5 steel pipe
10, small bar spacing: 500 mm
11, beam side stud space: 1 m
12, beam side span poling direction space (less than) : 1 m
13, poling basis: 50 mm thick concrete floor with wooden planks
14, Max tonetto jacking beam type: no beam
15, beam bottom rod span direction spacing (less than) : 1 m
16, beam bottom rod transverse spacing: 0.33 m
17, horizontal bar interval: 1.5 m
18, the top plate under 2 level step length is adjusted for: 0.95 m
19, level rod assembly steps (including sweep the floor and at the top of the encryption area, do not contain additional levels under beam) : step 4
20, sweeping stem from the body surface: on the basis of 200 mm
Under 21, plate rack body contains set-up height adjustable bracket (to the top, buckle plate thickness) : 3.91 m
22, the bottom of the beam top stud with set-up height adjustable bracket () to the top, buckle plate thickness: 3.31 m
23, the support frame body calculation height (equal to the height) : 4.2 m
24, poling under plate support free end height: 400 mm
25 and under beam poling support free end height: 400 mm
26, beam under whether additional horizontal bar: additional a horizontal bar, the beam under the topside poling free end height control within 500
Third, lateral beam template parameters:
1, the beam breadth: 400 mm
2, beam height: 700 mm
3, floor thickness: 100 mm
4, template materials: plywood
5, the thickness of the template: 15 mm
6, beam side wood square root number, root
7, wood square section specifications: 50 * 80 mm
8, wood square distance: 315 mm
9, selection of the main keel: double steel pipe
(no more than 10, the main keel spacing) : 450 mm
11, the bolt diameter: 14 mm
12, the bolt number: 2
13, the vertical distance between bolt: 300 mm
14, the first line of bolts from the bottom of the beam: 150 mm
15, the bolt spacin
您可能关注的文档
- A题劳动效率预测问题.doc
- B-5施工规格书.doc
- B-N四六级词汇.doc
- B-T型导检验规程.doc
- B-spline曲面的法线贴图.doc
- B107-1_2.doc
- B12-5背诵定稿6篇.doc
- b199c5ce0e592e8d2892161bf876a524.doc
- B1SDK之88SP1表格控件单元格设置篇.docx
- B1Ceogenderand.doc
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
原创力文档

文档评论(0)