冷凝水管路尺寸计算.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冷凝水管路尺寸计算冷凝水管路尺寸计算

The condensate pipe sizing chart The condensate pipe sizing chart (Figure 14.3.5) can be used to size any type of condensate line, including: Drain lines containing no flash steam. Lines consisting of two-phase flow, such as trap discharge lines, which are selected according to the pressures either side of the trap. The chart (Figure 14.3.5): Works around acceptable flash steam velocities of 15 - 20 m/s, according to the pipe size and the proportion of flash steam formed. Can be used with condensate temperatures lower than the steam saturation temperature, as will be the case when using thermostatic steam traps. Is used to size trap discharge lines on full-load conditions. It is not necessary to consider any oversizing factors for start-up load or the removal of non-condensable gases. May also be used to estimate sizes for pumped lines containing condensate below 100°C. This will be discussed in Tutorial 14.4. Fig. 14.3.5 Condensate pipe sizing chart Using the condensate pipe sizing chart (Also available in Appendix 14.3.2) Establish the point where the steam and condensate pressures meet (lower part of the chart, Figure 14.3.5). From this point, move vertically up to the upper chart to meet the required condensate rate. If the discharge line is falling (non-flooded) and the selection is on or between lines, choose the lower line size. If the discharge line is rising, and therefore likely to be flooded, choose the upper line size. Note: The reasoning employed for the sizing of a steam trap is different to that used for a discharge line, and it is perfectly normal for a trap discharge line to be sized different to the trap it is serving. However, when the trap is correctly sized, the usual ancillary equipment associated with a steam trap station, such as isolation valves, strainer, trap testing chamber, and check valve, can be the same size as the trapping device selected, whatever the discharge line size. A steam trap passing a full-load of 1000 kg/h at 6

文档评论(0)

pkaokqunw + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档