i n c l i n i n g t e s t a n d l i g h t w e i g h t c h e c k(我希望这是一个好的结果,但这不是一个好的结果。).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
i n c l i n i n g t e s t a n d l i g h t w e i g h t c h e c k(我希望这是一个好的结果,但这不是一个好的结果。)
Inclining test and lightweight check
By Hakan Aky?ld?z
1. General
1.1 General conditions of the ship
The following conditions are to be met, as far as praticable :
The weather conditions are to be favourable
The ship is to be moored in a quiet, sheltered area free from extraneous forces, such as to allow unrestrictedheeling. The ship is to be positioned in order to minimise the effects of possible wind, stream and tide
The ship is to be transversely upright and the trim is to be taken not more than 1% of the length between perpendiculars. Otherwise, hydrostatic data and sounding tables are to be available for the actual trim
Cranes, derrick, lifeboats and liferafts capable of inducing oscillations are to be secured
Main and auxiliary boilers, pipes and any other system containing liquids are to be filled
The bilge and the decks are to be thoroughly dried
Preferably, all tanks are to be empty and clean, or completely full. The number of tanks containing liquids is to be reduced to a minimum taking into account the above-mentioned trim. The shape of the tank is to be such that the free surface effect can be accurately determined and remain almost constant during the test. All cross connections are to be closed
The weights necessary for the inclination are to be already on board, located in the correct place
All work on board is to be suspended and crew or personnel not directly involved in the incline test are to leave the ship
The ship is to be as complete as possible at the time of the test. The number of weights to be removed, added or shifted is to be limited to a minimum. Temporary material, tool boxes, staging, sand, debris, etc., on board is to be reduced to an absolute minimum.
1.2 Inclining weights
The total weight used is preferably to be sufficient to provide a minimum inclination of one degree and a maximum of four degrees of heel to each side. The Society may, however, accept a smaller inclination angle for large ships provided that the requi
您可能关注的文档
- h o u s e h o l d f o o d& l i v e l i h o o d s e c u r i t y(因为有人要我和你,所以我也没有你。).doc
- h o u s i n g r i g h t s v i o l a t i o n s, m e r o w e d a m, s u d a n(如果有人愿意,那我就在这里等你。).doc
- h o w t o s e t u p y o u r t n t3(h o w t o s e t u p y o u r t n t3).doc
- h s376美国职业女性和现代城市,1870-1940( h s376 u s workingwomen& the modern city,1870-1940).doc
- h u d f e d e r a l r e g i s t e r r u l e s, n o t i c e s& f u n d i n g(希望有一天,如果有一天,如果有一天,如果有一天,我们有一天会遇到一些问题。).docx
- h v a c guide specifications- mitsubishi electric(一个c指南规格-三菱电气).doc
- h v a c guide specifications- my link drive(一个c指南规格-我的链接驱动器).doc
- h089759- u. s. customsand border protection(美国海关和边境保护h089759).doc
- handbook chapter- rowan university(手册章-罗文大学).doc
- hazard mitigation planning toolsand techniques(减灾规划的工具和技术).doc
- 实施指南(2025)《JB_T 12842-2016空调系统用辐射换热器》.pptx
- 实施指南(2025)《JB_T 12843 - 2016 离心式制冷剂压缩机解读》.pptx
- 实施指南(2025)《JB_T 12851-2016柴油机喷油泵 等压出油阀偶件》.pptx
- 实施指南(2025)《HJ 804-2016土壤 8种有效态元素的测定 二乙烯三胺五乙酸浸提-电感耦合等离子体发射光谱法》.pptx
- 实施指南(2025)《HJ600-2011水质梯恩梯、黑索今、地恩梯的测定气相色谱法》.pptx
- 实施指南(2025)《JB_T 6118 - 2016 沉降过滤离心机解析》.pptx
- 实施指南(2025)《HJ 811-2016水质 总硒的测定 3,3'-二氨基联苯胺分光光度法》.pptx
- 实施指南(2025)《HJ 814-2016水和土壤样品中钚的放射化学分析方法》.pptx
- 实施指南(2025)《HJ19-2011环境影响评价技术导则生态影响》.pptx
- 实施指南(2025)《HJ605-2011 土壤挥发性有机物检测标准解读》.pptx
文档评论(0)