最实用的一线《试油》英语学习资料.docVIP

  • 12
  • 0
  • 约1.2万字
  • 约 6页
  • 2017-01-16 发布于重庆
  • 举报

最实用的一线《试油》英语学习资料.doc

最实用的一线《试油》英语学习资料

英语资料 1. Todays work is swabbing drainage(今天的工作是抽汲排液) 2. March 31 8:00-16:00 swabbing drainage under 16 times, deep: 2000m, liquid level: 1800m, spare oil: 1.43 m 3, already buckle bubble 10% 12%, emulsify water: aquifer 3, free water 0.20 m 3 1.36 m3, Cl - : 15957mg/L, PH: 6, contain arenaceous 0.(3月31日8:00-16:00抽汲排液16次,下深:2000m,液面:1800m,抽出油:1.43m3,已扣气泡10%含水12%,乳化水:0.20m3,游离水1.36m3,Cl-:15957mg/L,PH:6,含砂0.) 3. Try oil production dynamic report(试油生产动态汇报) 4. Up D73.02 mm outer thickening tubing 45 root (unfinished),(起D73.02mm外加厚油管45根(未完),) 5. Bad, the workover machines motorcycle(修井机坏,修机车) 6. 73.02 mm within D: outer thickening tubing 25 root, bring out d62mm blasting stylus(起D:73.02mm外加厚油管25根,带出d62mm冲砂笔尖) 7. 73.02 mm next D: outer thickening the tubing with D100mm 130 root, screw pump and D116mm cone bit a set of three, at the root square into 1.57 m pressurized 20kN Ethan grey surface, H: 1231.94 m, after Ethan 2 times depth is changeless, complete 1231.50 m to:.(下D:73.02mm外加厚油管130根,底带D100mm螺杆泵及D116mm三牙轮钻头一套,末根方入1.57m加压20kN探灰面,H:1231.94m,复探2次深度不变,后完成至:1231.50m。) 8. Use Cl - 177mg/L, PH: 7 15m 3 are circulating water drilling ash P: 0MPa, cork, P: qv: 500L/min, pressurized 0-30kN no footage.(用Cl-177mg/L,PH:7的清水15m3正循环钻灰塞,P:0MPa,qv:500L/min,加压0-30kN无进尺。) 9. 73.02 mm within D: outer thickening tubing 130 root, bring out D100mm screw pump and D116mm cone bit a set of three(起D:73.02mm外加厚油管130根,带出D100mm螺杆泵及D116mm三牙轮钻头一套) 10. 73.02 mm next D: 130 root, outer thickening of tubing with D: 116mm stamping.(下D:73.02mm外加厚油管130根,底带D:116mm铅印。) 11. Use Cl - 177mg/L, PH: 7 3 are circulating water 10m rinse, P: 0MPa, qv: 500L/min, pressurized 30kN dozen stamping, H: 1231.94 m.(用Cl-177mg/L,PH:7的清水10m3正循环冲洗,P:0MPa,qv:500L/min,加压30kN打铅印,H:1231.94m。) 12. Up D73.02 mm outer thickening tubing 130 root, out there D116mm stamping (Wells round steel wire and fall content).(起D73.02mm外加厚油管130根,带出D116mm铅印(井内有钢丝绳及圆状落物)) 13.Send fishing tools.(等送打捞工具。) 14. 73.02 mm next D: outer thick

文档评论(0)

1亿VIP精品文档

相关文档