functional performance test(功能性能测试).doc

functional performance test(功能性能测试).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Functional Performance Test Variable Frequency Drive (VFD) Pump Application Secondary Hydronic Pump Application Project: __________________________________ Date: __________________ Address: __________________________________ Commissioning Participants: Commissioning agent (CA): _______________________ of _____________________ EMS operator: _______________________ of _____________________ VFD technician: _______________________ of _____________________ HVAC technician: _______________________ of _____________________ Owners rep.: _______________________ of _____________________ Pumps ID:_____ _____ _____ ____ Chilled water (CHW) secondary, ___Hot water (HW) Design max.: Hp: ____ GPM: ______ Head _____ Ft VFD brand and model: ________________________________________________________ The following functional performance test is for a VFD controlling a variable flow hydronic system to a constant differential pressure (DP). A check-mark denotes acceptance or compliance. I. Design Intent and Documentation Verification ___ Review the design documents and the specifications. ___ Verify that the VFD ___description, ___specifications, ___technical and troubleshooting guide and the installation, ___programming record and ___balance report are on-site. From the design documents determine: Location for the DP measurement: _____________________________________________________________________ Control strategy for the pump:__________________________________________ _________________________________________________________________________ II. VFD Installation Differential Pressure Sensor Actual location of DP measurement____________________________________ The measurement should ideally be taken across the coil of the last branch. ____Complies? Pressure Offset (Po) Conversion: psi x 2.31 = ft H2O DP pump is being controlled to: _______feet [A]. Pressure rise across pump at design conditions (from

文档评论(0)

bgl001 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档