- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
section628-shotcrete-departmentoftransportation
Amend Section 628 – Shotcrete to read as follows:
“SECTION 628 SHOTCRETE
628.01 Description. This section describes furnishing and placing shotcrete (pneumatically applied mortar) for lining ditches and channels, paving slopes, constructing portions of structures, texturing concrete surfaces, encasing steel members, and other miscellaneous work. Shotcrete consists of pneumatically applied mortar using either the dry-mix or wet-mix process.
628.02 Materials.
Structural Concrete 601
Portland Cement 701.01
Welded Wire Fabric Reinforcement 709.01(C)
Water 712.01
Use fine aggregate conforming to Subsection 703.01 - Fine Aggregate for Concrete, except maximum percentage for material passing the No. 100 sieve shall be 15 percent. Use fine aggregate with minimum sand equivalent of 60.
If admixtures are proposed, submit type, quantity, and manner of admixture incorporation.
628.03 Construction. Use shotcrete only at locations indicated in the contract documents or ordered by the Engineer.
(A) Proportioning, Batching, and Mixing. Submit proposed mix design three weeks prior to start of work. Batch the quantity of water as specified in mix design accepted by the Engineer for the process used. Proportion mortar ingredients, except water, either by volume or by weight.
Batches requiring fractional sacks will not be allowed unless cement is weighed. Use mixtures within time requirements as specified in Section?601? Structural Concrete.
(1) Dry-Mix Process. Thoroughly mix cement and fine aggregate before charging into delivery equipment. Maintain moisture content of fine aggregate between 3 to 6 percent, such that fine aggregatecement mixture flows at a uniform rate (without slugs) through delivery hose.
(2) Wet-Mix Process. Mix material at central mixing plant or at project site. If mixing is done at project site, use mixer capable of thoroughly mixing specified materials in sufficient quantity to
您可能关注的文档
- safetyprecautions-shaveroutdoorwoodfurnace(18页).doc
- safetyprecautions-shaveroutdoorwoodfurnace.doc
- safeuseofcranes-cranelift(25页).doc
- safeworkingprocedure-unsw(7页).doc
- safeworkingprocedure-unsw.doc
- safeworkmethodstatements-rooftilingsydney(8页).doc
- safeworkmethodstatements-rooftilingsydney.doc
- samplequalityassurancesurveillanceplan-gsa(8页).doc
- sampleschemeofwork-ocr(37页).doc
- samplesciencefairintro-wikispaces(60页).doc
- section02300-newyork(21页).doc
- section02300-newyork.doc
- section02316-newyork(7页).doc
- section02316-newyork.doc
- section02466-drilledpiers(8页).doc
- section02466-drilledpiers.doc
- section12494-solartracrollershadesystem(10页).doc
- section12494-solartracrollershadesystem.doc
- section16134-newyork(7页).doc
- section16134-newyork.doc
最近下载
- 宪法学(第二版)(马克思主义理论研究和建设工程重点教材)课件第4章国家性质和国家形式.pptx VIP
- 1_1_负反馈率计算表.xlsx VIP
- 纳米磁性材料介绍.pptx VIP
- 中国螺栓检测服务行业市场占有率及投资前景预测分析报告.docx VIP
- 2011年2月4日巴西东北部电网停电事故分析.ppt VIP
- 踝关节扭伤治疗.pptx
- 美术鉴赏通识教育(西北大)中国大学MOOC慕课 章节测验答案.pdf VIP
- 排球裁判手势图1.docx
- GA_T 1093-2013出入口控制人脸识别系统技术要求.docx VIP
- 2025年湖南株洲市工会社会工作者招聘30人笔试备考试题及答案解析.docx VIP
文档评论(0)