- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
LEEDGA考試模拟题c组
Question 1 Construction and demolition debris includes all but which of the following?
?A
Concrete from a demolished building
?B
Steel from a demolished building
?C
Drywall
?D
Rocks Notes:Reference: OM GlossaryConstruction and demolition (CD) debris is defined as: Waste and recyclables generated from construction, renovation, and demolition or deconstruction of preexisting structures.Rocks would be part of the excavation of the site area.The steel and concrete are all debris that came from the existing building.Drywall can come from an existing building or as scraps from new construction.Hazardous materials, excavated soil (rocks) and land-clearing debris do not contribute to LEED credits but these items should still be addressed in a construction waste management plan.
Question 2 What should be included in a construction waste management plan?
?A
Asbestos removal
?B
Where construction debris will be diverted
?C
Erosion control
?D
The percent of recycled materials Notes:The plan should include the goals of the team as well as what will be diverted, where to, and by whom.Hazardous waste is not included and must be disposed of based on local codes.
Question 3 Show Answer Legend A project team discovers a new way to avoid the heat island effect. How does the LEED certification process reward this new concept?
?A
Heat Island Effect is covered by LEED, so no additional points would be given
?B
An innovative performance point would be awarded
?C
An exemplary performance point would be awarded
?D
An extra Heat Island Effect point would be awarded Notes:Innovative performance as part of the Innovation in Design or Operations category is meant for green building categories not specifically addressed by LEED. Innovation credits are not awarded for the use of a particular product or design strategy if the technology aids in the achievement of an existing LEED credit.USGBC/GBCI uses the