- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Environmental Impact Assessment Ordinance (Cap. 499)
Section 5 (7)
Environmental Impact Assessment Study Brief No. ESB-096/2002
Project Title : Central Kowloon Route
(hereinafter known as the Project)
Name of Applicant : Highways Department, HKSAR Government
(hereinafter known as the Applicant)
BACKGROUND
1.1 An application (No. ESB-096/2002) for an Environmental Impact Assessment (EIA) study brief under section 5(1) of the Environmental Impact Assessment Ordinance (EIAO) was submitted by the Applicant on 5 January 2002 with a project profile (No. PP-158/2002) (the Project Profile).
1.2 The Applicant proposes to construct a dual-2 lane trunk road, named the Central Kowloon Route (CKR) (the Project), across the Kowloon Peninsula of the Hong Kong Special Administrative Region (HKSAR) linking the West Kowloon Reclamation in the west and the proposed South East Kowloon Development (SEKD) in the east. The Project will connect the West Kowloon Highway at Yau Ma Tei Interchange to the future Trunk Road T2 at SEKD and Tseung Kwan O Western Coast Road to form a strategic highway link to serve the existing and planned developments in West Kowloon, East Kowloon and Tseung Kwan O. The scope of the Project does not cover the reclamation works for the SEKD as it has been assumed that the new reclamation under SEKD for the eastern landfall of the CKR will be available at the time of construction of the CKR (section 3.3.1 of the Project Profile refers). The scope of the Project is shown in Appendix A and described below :-
provision of elevated and at-grade slip road connections between the tunnel and the road network on the West Kowloon Reclamation, including modifications to the Yau Ma Tei Interchange;
re-alignment of drainage culverts on the West Kowloon Reclamation affected by the tunnel;
replacement of a section of at-grade road D1 (Hoi Wang Road) by an elevated road;
construction of tunnel ramps, a tunnel portal and a ventilation building w
您可能关注的文档
- airman knowledge test question bank12232004(飞行员bank12232004知识测试问题)(64页).doc
- airplanes can be networked- airborne internet(飞机可以联网,机载网络)(24页).doc
- airport i t& s implementation guidelines- a c c(机场我t s - c c实现指导方针)(110页).doc
- airport vehicle positioning system(机场的车辆定位系统)(18页).doc
- akronimdansingkatan(119页).doc
- alagappauniversity.ac.in(313页).doc
- all.ch- universityof calgary(所有人。ch -卡尔加里大学)(131页).doc
- alphabetical listof acronyms(字母列入缩写)(11页).doc
- an examinationof u- texas a& m university(德州一个examinationof u - m大学)(33页).doc
- an international comparative studyof artificial neural(国际比较studyof人工神经)(14页).doc
- 2025年中国锂离子分离器行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国EDTA铁钠盐行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国FIP导电橡胶衬垫行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国ICSI注射移液器行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国两层柔性覆铜板行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国粒状聚四氟乙烯行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国立式超低温冰箱行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国EDLC(双电层电容器)电解液行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国J型周边导丝行业市场分析及投资价值评估前景预测报告.docx
- 2025年中国D-丙氨酰-D-丙氨酸试剂行业市场分析及投资价值评估前景预测报告.docx
最近下载
- GBT176—2017水泥化学分析方法.docx VIP
- 无人机气象监测解决方案.docx VIP
- 卓越研究生英语_综合教程1(人文篇)吴樯_习题答案解析.pdf
- 临床伦理和科研道德学堂在线答案.docx VIP
- 大模型重构大数据产业发展白皮书-时代呼唤全新的大数据.docx VIP
- 深基坑开挖、支护及降水安全专项施工方案.pdf VIP
- 2025黑龙江省农业投资集团有限公司招聘12人笔试备考试题及答案解析.docx VIP
- 游标卡尺的读数方法.ppt VIP
- 一年级10以内口算100道题共20套直接.docx VIP
- 2025年国家公务员考录《申论》真题及参考答案(行政执法卷).docx VIP
文档评论(0)