draft scopeof services-10% design- connecticut(草案设计——康涅狄格scopeof服务- 10%)(12页).docVIP

draft scopeof services-10% design- connecticut(草案设计——康涅狄格scopeof服务- 10%)(12页).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Draft Scope of Services Preliminary Engineering (10% Design) State Pier Improvements, New London CDOT #00-940222PL MMI Project No. 1433-62 August 24, 2011 Introduction Among the many recommendations in the Draft State Pier Needs and Deficiencies Study are significant improvements to the infrastructure at the facility including the relocation of access roads, renovation to the piers, improvements to the bulkheads, paving of storage areas, and the construction of a new warehouse. The Connecticut Department of Transportation (CDOT) is taking the next step in implementing the recommendations of the study by commissioning a Preliminary Engineering Study (10% Design) and an Environmental Impact Evaluation (EIE) of the proposed improvements. The 10% Design submission will include the preparation of schematic plans having suitable detail in order to develop construction cost opinions and to identify potential impacts to the environment, utilities, rights-of-way and the surrounding roadway network. The final deliverable will include schematic plans (10% design level), developed with limited engineering calculations, and a design report summary zing findings and recommendations. In addition, the EIE will be prepared to meet the requirements of both the Connecticut Environmental Policy Act (CEPA) and the National Environmental Policy Act (NEPA). Scope of Services Task 1.0 – Survey Ground Control – Establish horizontal and vertical control on site for the purpose of conducting topographic ground, property and hydrographic surveys. Horizontal control will be based on the Connecticut Coordinate Grid System, NAD 83. Vertical control will be based on NAVD88, consistent with the FEMA’s updated floodplain mapping. Furnish two points each for vertical and horizontal control in the vicinity of State Pier and also in the vicinity of Long Dock. Control points established shall be semi-permanent. Boring Stake-Out – Stake out proposed borings and test pit locations i

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档