可動态生成具有优先级工序集的动态Job-Shop调度算法(.docVIP

  • 7
  • 0
  • 约1.01万字
  • 约 10页
  • 2017-01-19 发布于重庆
  • 举报

可動态生成具有优先级工序集的动态Job-Shop调度算法(.doc

可動态生成具有优先级工序集的动态Job-Shop调度算法(

可动态生成具有优先级工序集的动态Job-Shop调度算法*哈尔滨理工大学哈尔滨 150080哈尔滨大学哈尔滨 1500哈尔滨理工大学 机械动力工程学院 哈尔滨 150080Dynamic Job-Shop Scheduling Algorithm with Dynamic Set of Operation Having Priority XIE Zhiqiang 1) YANG Jing2) YANG Guang1) TAN Guangyu3) 1) (School of Computer Science and Technology, Harbin University of Science and Technology, Harbin 150080) 2) (School of Computer Science and Technology, Harbin Engineering University, Harbin 150001) 3) (School of Mechanical Power Engineering, Harbin University of Science and Technology, Harbin 150080) Abstract To make the total processing time of job added into job

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档