appendix- environmental protection department(附录-环境保护部门)(28页).docVIP

appendix- environmental protection department(附录-环境保护部门)(28页).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Environmental Impact Assessment Ordinance (Cap. 499), Section 5 (7) Environmental Impact Assessment Study Brief No. ESB-039 /1999 Project Title : Comprehensive Feasibility Study for the Revised Scheme of South East Kowloon Development Name of Applicant: Kowloon Development Office, Territory Development Department (hereinafter known as the Applicant) 1. BACKGROUND 1.1 The gazettal of draft Outline Zoning Plans (OZPs) for the proposed South East Kowloon Development (SEKD) on 4 September 1998 attracted a large amount of public comments and concerns. As a result of a series of public consultations conducted since the draft OZP gazettal, a revised scheme of SEKD has been prepared to incorporate the main views expressed by the public. Based on the new layout, a comprehensive feasibility study will be carried out to evaluate the revised scheme of SEKD. 1.2 An application (No. ESB-039/1999) for an EIA study brief under section 5(1) of the Environmental Impact Assessment Ordinance (EIAO) was submitted by the captioned Applicant on 12th?August 1999 with a Project Profile (No. PP-058/1999) on the captioned project. 1.3 The Applicant proposes to conduct a feasibility study for the revised scheme of SEKD. The New Development Area under the revised scheme of SEKD covers about 540 hectares in total, including: (i) about 280 ha. of disused Kai Tak Airport apron and runway; (ii) about 80 ha. of reclamation in Kowloon Bay; (iii) about 80 ha. of reclamation in Kai Tak Approach Channel/Kwun Tong Typhoon Shelter; and (iv) about 100 ha. of other areas, e.g. proposed new typhoon shelter. 1.4 The proposed developments in the revised scheme of SEKD are shown in the Outline Concept Plan attached to the Project Profile and shown in Appendix I attached. 1.5 The project falls within Item 1 in Schedule 3 of the EIAO and is a major designated project (DP) requiring an environmental impact assessment report to be approved under th

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档