- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Calculating Friction Loss
by Scott Martorano, CFPS April 10, 2006
Here’s why the Darcy-Weisbach formula is more appropriate than Hazen-Williams for friction loss calculations in large volume sprinkler systems that use propylene glycol.
Propylene glycol has been widely accepted and utilized in fire sprinkler systems for many years. Until recently it has been restricted to antifreeze loops on wet pipe sprinkler systems. Innovative advances in the design of sprinkler systems and full-scale fire testing of class 2 commodities in rack storage configurations have demonstrated that sprinkler systems pre-primed with a water and propylene glycol solution utilizing K 25.2 sprinklers are a viable option for the protection of cold storage occupancies under certain conditions.
Full-scale burn testing has been conducted utilizing specific types of sprinkler systems, propylene glycol solutions and K 25.2 ESFR sprinklers that have been specifically tested for the application. The listings and manufacturer’s installation instructions for these propylene glycol systems are very specific with regards to the type of system, the system volume and the piping configuration. If a system is selected to protect a cold storage occupancy using a propylene glycol solution, the fire protection designer must verify the appropriate product listings. In addition, the manufacturer’s technical literature must be reviewed to ensure that the system design is in compliance with the listings and that all of the required components have been installed.
Application There are currently two sprinkler system configurations utilized for installation in cold storage applications that include piping pre-primed with the propylene glycol solution. The early versions of these systems were wet pipe sprinkler systems. However, through improvements and modifications implemented to enhance system performance in cold storage environments, the optimal system has evolved into a single interlock preaction sys
您可能关注的文档
- c h a p t e r t h r e e- caritas university(c h p t e t h r e e -博爱大学)(106页).doc
- c h a p t e r1 n e w w o r l d b e g i n n i n g s33,000 b(c h p t e r1 n e w w o r l d b e g我n n n g s33,000 b)(51页).doc
- c h a p t e r3 w r i t i n g a n o f f i c e m e m o r a n d u m(w c h p t e r3 r i t i n g n o f f i c e m e m o r n d u m)(12页).doc
- c h a p t e r13 t h e t r a n s f e r o f h e a t- valdosta state university(c h p t e r13 t h e t r n s e r o f h e t -瓦尔多斯塔州立大学)(16页).doc
- c h a p t e r61 a-2- d b p r home page(c h p t e r61 a - d b p r主页)(29页).doc
- c h a r t c o m p o n e n t s n o t e s(c h r t c o m p o n e n t s n o t e s)(17页).doc
- c h a r t i n g a c o u r s e- t c a l l(c h r t i c n g o u r s e - t c l l)(78页).doc
- c l i m b i n g s t a f f m a n u a l- cornell outdoor education(c l我我n g s t f f m n u l -康奈尔户外教育)(44页).doc
- c o a s t a n d m o u n t a i n s e c o p r o v i n c e- british columbia(c o s t n d m o u n t i n s e c o p c r o v i n e -不列颠哥伦比亚省)(14页).doc
- c o m m o n w e a l t h o f m a s s a c h u s e t t s(c o m m o n w e l t h o f m s s c h u s e t t s)(131页).doc
- california environmental protection agency(加州环境保护署)(7页).doc
- california codeof regulations, title23, division3, chapter(加州均规定,title23 division3,章节)(94页).doc
- capacitors- r a i d e r p h y s i c s(电容器- r i d e r p h y s i c s)(5页).doc
- caves, canyons, cactus& critters(洞穴,峡谷、仙人掌生物)(20页).doc
- cbcs-regulationsandsyllabifori&iisemesterb.sc(375页).doc
- centralnewmexicoelectriccooperative,inc(5页).doc
- centricity e m r preload training(中心性e m r预加载训练)(8页).doc
- ceramicscompletemodule3-18-96(ceramicscompletemodule3 - 18 - 96)(78页).doc
- cert2-wayradiofundamentals(8页).doc
- certificationofpersonalprotectiveequipmentforworkingon(6页).doc
文档评论(0)