- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SECTION 26 08 16 – electrical systems functional performance tests
GENERAL
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.
Specifications throughout all Divisions of the Project Manual are directly applicable to this Section, and this Section is directly applicable to them.
SUMMARY
This Section expands on and defines responsibilities of the Contractor in regards to Functional Performance Tests (FPT’s) of the Commissioning process.
Contractor shall oversee the Commissioning activities with the Contractor’s Subcontractors and the Commissioning Team.
Prefunctional Checklists, tests and Start-ups are to be completed and documented for the record prior to commencing with FPT’s. Refer to Section 01 91 00, 26 08 00 and 26 08 13 for additional requirements.
Completed FPT Forms for all pieces of equipment and systems shall be submitted to the Owner prior to Substantial Completion.
Refer to Attachments A and B at the end of this Section for example forms that indicate level of documentation required for the Commissioning process.
An independent Electrical Testing Company shall complete their required testing after Equipment Startup and before Functional Performance Testing beginnings.
REFERENCE STANDARDS
The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date.
All reference amendments adopted prior to the effective date of this Contract shall be applicable to this Project.
All materials, installation and workmanship shall comply with all applicable requirements and standards.
SUBMITTALS
Maintain and use an action item tracking system, “Action Item List,” that indicates as a minimum, required information, identified deficiencies, work required, etc.). Each item shall be tracked with the initiator, the parties responsible, due date, the date of closure, and a description of the resolution. Each it
您可能关注的文档
- departmentof hospitality management(departmentof酒店管理).doc
- design& buildinga million gallon tankfor tunaat the(设计buildinga百万加仑tankfor tunaat).doc
- delimitationof rs( c), rs( n)and rs( e)(delimitationof rs(c)、rs(n)和rs(e)).doc
- design- build( d b) requestfor proposal( r f p) templatewith(设计-建造(d b)(r f p)templatewith requestfor提案).doc
- detailedevaluationof o b i a dashboard design best practices(detailedevaluationof啊我一个仪表板设计最佳实践).doc
- determiningthecompositionofgasolines.doc
- diabetes self- management education assessment(糖尿病自我管理教育评估).doc
- displayunitswherebasicigneousrocksdominate(displayunitswherebasicigneousrocksdominate).doc
- disaster medical systems(灾难医疗系统).doc
- disability history.doc(残疾history.doc).doc
- electromagneticinduction-facstaffhomepageforcbu.doc
- electricity-troop1127.doc
- electronic health record core requirements(电子健康记录核心需求).doc
- elementsofthe a c e mentor program(elementsofthe a c e导师计划).doc
- emergency department productivity profiling(急诊科效率分析).doc
- energyandminerals.go.ug.doc
- environment, safety,and health( e s h) integration guidefor(环境、安全、健康guidefor(e s h)集成).doc
- equipment name- walchem, an iwaki america company(设备名称,walchem磐美国公司).doc
- estimating emissions from your printed circuit board(从你的印刷电路板估算排放).doc
- enhancing maritime domain awareness(加强领海感知能力).doc
原创力文档


文档评论(0)