boroughof avalon(boroughof阿瓦隆).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
boroughof avalon(boroughof阿瓦隆)

In September 2006, the Borough of Avalon completed the five-year update of its Flood Mitigation Plan (FMP). The FMP describes the flood mitigation planning efforts of the Borough, following FEMA’s Community Rating System (CRS) 10-step planning process. This evaluation report is prepared in accordance with the procedures established in Section V of the FMP (“Plan Maintenance”). On September 30, 2009 the Flood Mitigation Planning Committee conducted a Plan Review Meeting to review the current plan, assess progress and effectiveness of the plan objectives, and compile and discuss suggested changes or additions to the plan. The following members of the Flood Mitigation Planning Committee, Borough representatives, and members of the public attended the meeting: Salvatore DeSimone, Construction Official (CRS Coordinator) Thomas Thornton, PE, Hatch Mott MacDonald, Borough Engineer Kevin Scarpa, Chief, Avalon Emergency Medical Services Ed Dean, Chief, Avalon Fire Department Paul Short, Sr., Avalon Planning Board Secretary, Deputy Emergency Management Coordinator John Tracy, Avalon Construction Office, Building Sub Code Official In accordance with the Flood Mitigation Plan, the Flood Mitigation Planning Committee conducted a Plan Revision Meeting in April 2010 to review the revisions to the draft evaluation report. Proposed revisions to the FMP will consist of minor updates to the ongoing flood mitigation activities conducted by the Borough. Although these changes are minor, the FMP will be updated in accordance with the Plan Maintenance schedule outlined in Section V of the FMP. This process includes: preparing the evaluation report and draft revisions; conducting a plan revision meeting to review evaluation report and draft revisions; providing the evaluation report to the media and making it available to the public; conducting a public meeting to obtain input from Borough Council and the public; finalizing the revised plan; and adopting the changes to the FM

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档