- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project: N407 Project Manager : Mr: Graham Location: COSCO qi dong shipyard Date: 2012-Aug-22 Position No 3 P
Personnel attended during inspection: Shipyard coating inspector Shipyard project manager Shipyard coating supervisor Class representative Jotun representative Owner coating inspector
The content of this report as following: 1 The survey assessment procedure 2 The condition of each part, bulkheads, underdeck, tanktop,
The comparison of photos and standard( ASTM D610-1) 3 The general condition tank 4 The method of surface treatment and coating application procedure
Survey procedure: 1 All hot work was completed, the tank was high pressure washed, and heat air dried before syrvey. 2 The survey and visual inspection results under the good illumination 3 The survey method according to 4 side PSPC agreement 4 Calculation is not include the butts and tight –seams coating damages 5 Calculation of the spot piece damages on bulkhead , underdeck , tanktop, each coating damages areas were calculated from similar figure area. 6 Confirm the percentage of damaged areas refer to ASTM D610-01 of annex 1,base on exact measure areas 7 Surface treatment method according to the PSPC requirement
NO: CHART: Fore bulkhead Port bulkhead Tanktop Starboard bulkhead
Support: L
Burned: o
Machinery: .
Reinforcement: |
Pipe penetration: ◎
Contamination: ∷
Butts: ┅ After bulkhead Underdeck Project N407 Tank No 3P Total areas 2800 Damaged areas Fore bulkhead Port bulkhead Starboard bulkhead After bulkhead 1
stage support burned machinery reinforcement contaminated 2 stage support burned machinery reinforcement contaminated 3 stage support burned machinery reinforcement contaminated 4 stage support burned machinery reinforcement contaminated
您可能关注的文档
最近下载
- 皮带硫化知识.doc VIP
- [紧固件]常用紧固件选型设计.pdf VIP
- 高速公路钢筋混凝土盖板涵首件施工方案.doc VIP
- 解读《GB_Z 44526 - 2024无损检测 操作能力鉴定》全面解读.docx VIP
- 本田GX630-660-690发动机维修手册.pdf VIP
- 2025四川成都东部集团有限公司及下属企业招聘产业招商等岗位94人笔试备考题库及答案解析.docx VIP
- (全国通用)01-2023年秋季高一入学分班考试模拟卷地理试题(解析版).docx VIP
- 20210129-中信建投-因子深度研究系列:高频订单失衡及价差因子.pdf VIP
- 发电厂检修规程.docx VIP
- 2024-2025学年度第二学期期末综合素质调研七年级英语试题(含听力材料及答案).docx
文档评论(0)