procurementplan.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
procurementplan

Procurement Plan S?o Tomé and Príncipe: Adaptation to Climate Change Project (P111669; GEF PMIS 4018) April 25, 2011 General Project: The project aims to increase the adaptive capacity of vulnerable coastal communities in S. Tome and Principe to the adverse impacts of climate variability and change. Country: S?o Tomé and Príncipe Borrower: Democratic Republic of S?o Tomé and Príncipe Project Name: Adaptation to Climate Change Project Loan/Credit No. P111669/GEF PMIS 4018 Project Implementing Agency: Ministry of Public Works and Natural Resources, Directorate General of Environment (through a Project Coordinating Unit, PCU) Bank’s approval Date of the Procurement Plan: 25 April 2011 Date of General Procurement Notice: 16 May 2011 Period covered by this Procurement Plan: June 2011 to December 31, 2016 II. Goods and Works and Non-Consulting Services Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity. Procurement Method Prior Review Threshold Comments 1. ICB?and LIB (Goods) 250,000 All 2. NCB (Goods) ≥50,000250,000 First two contracts 3. Shopping (Goods) 50,000 Post review 4. ICB (Works) 500,000 All 5. NCB (Works) ≥50,000500,000 First two activities will be subject to prior review 6. Three (03) Quotations (Works) 50,000 Post review 2. Prequalification.?N/A. 3. Proposed Procedures for Community Participation Activities (as per paragraph. 3.17 of the Guidelines: Pilot adaptation works under Component 2(b) ii, estimated at a cumulative total of US$310,000 would be procured under Community Participation procedures and will be detailed in the procurement chapter of the Project Operation Manual Reference to (if any) Project Oper

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档