六单元Qualityandsafetyinconstruction.ppt

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
六单元Qualityandsafetyinconstruction

Unit 6 quality and safety in construction 质量和安全施工 Part 1 Concerning for quality and safety 关于质量和施工安全 Quality control and safety represent increasingly important concerns for project managers. Defects or failures in constructed facilities can result in very large costs. Even with minor defects, re-construction may be required and facility operations Impaired. Increased costs and delays are the result. In the worst case, failures may cause personal injuries or fatalities. Accidents during the construction process can similarly result in personal injuries and large costs. Indirect costs of insurance, inspection and regulation are increasing rapidly due to these increased direct costs. Good project managers try to ensure that the job is done right the first time and that no major accidents occur on the project. 对于项目经理而言质量控制和安全的关注日益重要。缺陷或失败的人工设施可以导致非常大的成本付出。即使有轻微的缺陷,重建可能使得设施业务受损。增加费用和延误工期。在最坏的情况下,故障可能导致人身伤害或死亡事故。在施工过程中同样可以造成人身伤害和大量费用支出。间接费用保险,检查和管理迅速增加,由于这些增加的直接费用。一个好的项目经理,应该努力确保工作第一时间完成任务同时没有重大事故发生。 As with cost control, the most important decisions regarding the quality of a completed facility are made during the design and planning stages rather than during construction. It is during these preliminary stages that component configurations ,material specifications and functional performance are decided. Quality control during construction consists largely of insuring conformance to these original design and planning decisions. While conformance to existing design decisions is the primary focus of quality control,there are exceptions to this rule. First,unforeseen circumstances, incorrect design decisions or changes desired by an owner in the facility function may require re-evaluation of design decisions during the course of construction. While these changes may be motivated by the concern for quality, they represent occasions for re-design with all the attendant objectives and constraints. As a second case,some designs rely upon informed and appropriate decision m

文档评论(0)

taotao0c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档