- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程专业外语混凝土含翻译
PAGE \* MERGEFORMAT9
1 The principles governing proper placement of concrete are:
2 Segregation must be avoided during all operations between the mixer and the point of placement, including final consolidation and finishing.
3 The concrete must be thoroughly consolidated, and should fill all angles and corners of the forms.
4 Where fresh concrete is placed on hardened concrete, a good bond must be developed.5 The temperature of fresh concrete must be controlled from the time of mixing through final placement, and protected after placement.
。6 Concrete may be conveyed from a mixer to point of placement by any of a variety of methods and equipment, if properly transported to avoid segregation.
Selection of the most appropriate technique for economy depends on jobsite conditions, especially project size, equipment, and the contractor’s experience.
In building construction, concrete usually is placed with hand-or power-operated buggies; drop bottom buckets with a crane; inclined chutes; flexible and rigid pipe by pumping; shot-crete, in which either dry materials and water are sprayed separately or mixed concrete is shot against the forms; and for underwater placing, tremie chutes (closed flexible tubes).
For mass concrete construction, side-dump cars on narrow-gage track or belt conveyers may be used
For pavement, concrete may be placed by bucket from the swinging boom of a paving mixer, directly by dump truck or mixer truck, or indirectly by trucks into a spreader.
7 Even within the specified limits on slump and water-cementitious materials ratio, excess water must be avoided.
In this context, excess water is presented for the conditions of placing if evidence of water rise (vertical segregation) or water flow (horizontal segregation) occurs.
Excess water also tends to aggravate surface defects by increased leakage through form openings. The result may be honeycomb, variations in color, or soft spots at the surface.
8 In vertical formwork, water ri
您可能关注的文档
- 另6建筑业营改增对工程计价影响与调整.pptx
- 同煤大唐热电二期扩建(2×330MW)1#机焊接施工技术工作汇报.doc
- 同德大街拖拉管施工组织设计.doc
- 名校课件 第三课时 未来的道路我选择.ppt
- 合阳县立体化防控体系建设方案1.0.docx
- 吕力公路施工组织设计.doc
- 吕梁恒大华府装修施工方案.doc
- 吉林省建筑工程资料管理标准2011年版.doc
- 名流印象现代简约装修案例赏析.docx
- 君联名都小区园林景观工程施工组织设计方案.doc
- 2024年中国钽材市场调查研究报告.docx
- 2024年中国不锈钢清洗车市场调查研究报告.docx
- 2024年中国分类垃圾箱市场调查研究报告.docx
- 2024年中国水气电磁阀市场调查研究报告.docx
- 2024年中国绿藻片市场调查研究报告.docx
- 2010-2023历年初中毕业升学考试(青海西宁卷)数学(带解析).docx
- 2010-2023历年福建厦门高一下学期质量检测地理卷.docx
- 2010-2023历年初中数学单元提优测试卷公式法(带解析).docx
- 2010-2023历年初中毕业升学考试(山东德州卷)化学(带解析).docx
- 2010-2023历年初中毕业升学考试(四川省泸州卷)化学(带解析).docx
文档评论(0)