- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
会计网上再教育管理会计学
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +1
您可能关注的文档
- 下半湖北会计从业会计基础试题及答案.doc
- 专升本会计学基础复习资料教师用.doc
- 东北财经大学财务管理专升本考试大纲.doc
- 下载财务管理咨询内容及财务公式.doc
- 东莞会计从业资格考试初级会计电算化押密模拟试题.doc
- 东莞会计培训机构金帐本第三季度会计从业资格考试财经法规模拟题十.doc
- 下半广东会计从业资格考试试题会计基础试题及答案.doc
- 东北财经大学专升本考试大纲财务管理.doc
- 东奥中级会计资格中级财务管理闫华红基础学习班第讲讲义.doc
- 东莞会计培训金账本管理会计历试题东莞学会计.doc
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析试题(含详细解析).docx
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析试卷(含答案详解).docx
- 传染病防控与救治技术.pptx
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析试卷(详解版).docx
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析试卷(含答案详解版).docx
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析练习题(含答案详解).docx
- 难点解析-苏科版九年级物理下册《电磁转换》定向训练试题(详解).docx
- 难点解析-苏科版九年级物理下册《电磁转换》定向训练试题(详解).docx
- 难点解析-苏科版九年级物理下册《电磁转换》必考点解析试题(含答案及解析).docx
- 难点解析-苏科版九年级物理下册《电磁转换》定向训练试题(解析版).docx
最近下载
- 江苏省化工和危险化学品生产企业安全审计表解读 2025年1月2日.pptx VIP
- 领导力与管理沟通PPT课件(共19章)第7章 口头表达.pptx VIP
- 2024版精简范本房屋买卖合同起诉状.docx VIP
- 领导力与管理沟通PPT课件(共19章)第2章 领导力解读.pptx VIP
- 2024-2025学年初中信息技术(信息科技)七年级全册河北大学版(2012)教学设计合集.docx
- 苏教版五年级上册数学全册课件.pptx VIP
- 领导力与管理沟通PPT课件(共19章)第16章 客户沟通.pptx VIP
- CH∕T 9017-2012 三维地理信息模型数据库规范.docx VIP
- 领导力与管理沟通PPT课件(共19章)第3章 领导力变革.pptx VIP
- 苏教版四年级上册数学全册教学课件 (3).pptx
文档评论(0)