国际贸易法25RemediesforBreachofContract.ppt

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际贸易法25RemediesforBreachofContract

Contents 5.1 Principles of Imputation[1] 5.2 Varieties of Conducts of Breaching the Contract 5.3 Breaches and Remedies 5.4 Damages 5.5 Specific Performance 5.6 Avoidance[2] 5.7 Other Remedies 5.8 Exemptible Causes [1] 违约的归责原则 [2] 解除合同 5.1 Principles of Imputation 1. Definition of Liability of Breaching a Contract When: After the conclusion of a contract What: Either party fails to perform its obligations as contracted shall bear the their respective liabilities 5.1 Principles of Imputation 2. Principles for Defining Liability (1) Principle of Fault (2) Principle of Presuming Fault (3) Principle of Non-fault 5.2 Varieties of Conducts of Breaching 1. Continental Law Failure to perform不履行 Failure to perform fully as contracted不完全履行 Delay performance履行迟延 Anticipatory breach预期违约 2.Anglo-American Law Breach of condition违反条件 Breach of warranty违反担保 Breach of innominate term违反中间性条款 3. CISG Actual Breach实际违约 Fundamental breach Non-Fundamental breach Anticipatory Breach预期违约 Fundamental breach it results in such detriment to the other party as substantially to deprive him of what he is entitled to expect under the contract unless the party in breach did not foresee and a reasonable person of the same kind in the same circumstances would not have foreseen such a result. Anticipatory Breach预期违约 Before performance is due, one party fails to perform as requested by the contract, that is anticipatory breach of a contract, and it can be divided into explicit breach and implicit breach of contract. Case 08.1Singapore Furniture Company sent an offer to a Fujian furniture factory to order 2000 leather cases, shipment before May 4th. The factory accepted the order and the parties signed the contract on Feb. 10th. So, the factory arranged to produce. On 3.25, the factory received a Fax from the furniture company, which claimed that the Fujian factory was a small factory and could not produce all the goods they ordered and claimed to cancel the co

文档评论(0)

sandaolingcrh + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档