设计一座公称容量350t的转炉(国外英文资料).docVIP

设计一座公称容量350t的转炉(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
设计一座公称容量350t的转炉(国外英文资料)

设计一座公称容量350t的转炉(国外英文资料) The school of science and technology of liaoning university is on page 9 Design a rotating furnace with a nominal capacity of 350t Converter type design Type 1, furnace design Oxygen avoidances the combined-blowing converter type is stout, due to the bottom to blow gas, so the nozzle should be set up, combined with the nominal capacity is larger, this design selects the type converter for the ball. The determination of the main parameters (1) the ratio of the effective volume of the furnace to the nominal capacity of the furnace in the new furnace. The furnace capacity of the converter is 0.9 ~ 1.05 m. / t, the design of the furnace ratio is 0.95 m? / t, the reason is that the top of the top of the furnace has been blown, which can reduce the factors such as splashing and slag, so the selection of the furnace is relatively small. (2), high ratio (ratio) than height to diameter value range between 1.35 ~ 1.65, this design in 1.35, the reason is that the same oxygen supply intensity, make mixing, reaction faster, more fully can shorten oxygen blowing time, starts to increase oxygen blowing time. (3) and the diameter of the molten pool: the diameter of the metal surface when the molten pool is in a calm state. D = D - the diameter of the molten pool, m; K - coefficients, see table 1; G - new furnace metal load, t, nominal capacity; T - the average steel for each furnace is pure oxygen time, min, shown in table 2. The value of the table 1 coefficient K The converter capacity/t ﹤ 30 30 ~ 100 St13 100 note K. 1.85 ~ 2.10 1.75 ~ 1.85 1.50 ~ 1.75 Large capacity takes the lower limit, the small capacity takes the upper limit Table 2, the average steel pure-oxygen time per furnace The converter capacity/t ﹤ 30 30 ~ 100 St13 100 note The oxygen blowing time/min 12 ~ 16 14 ~ 18 16 ~ 20 The value of this design is arbitrary according to different smelting steel This design K takes 1.5; Take a 20 min; G = 350 t, D = 1.5 x = 6.27 m (4) and the depth of the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档