施工1(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工1(国外英文资料)

施工1(国外英文资料) Chapter 8 the main construction methods of the pile foundation Construction technology The measurement of engineering, the excavation of the barrel, the right of the pile machine, the drilling hole to the rock, the identification of the rock and the steel and the steel cage The injection pipe goes to the pipe, the secondary clearance, the concrete and the pouring concrete and the filling pile hole. Method of construction: the construction method of the mud retaining wall and anti-recycle process. 8.3 process 8.3.1 engineering is used in the construction of the construction of the wall of positive and reverse circulation mud. The pile machine should be adjusted before construction 48.4 process of clearance and cleaning After the construction pile up to the base of the design pile, the tool of the pile machine is used to recycle the hole and make the hole inside When the mud weight is less than or equal to 1.20, the punch will be finished. 8.5.3 to hoist the steel cage by lifting crane crane, the transport of steel cage with manual handling, transportation and lifting to prevent the deformation of the steel cage. 8.6 concrete mixing and filling process 8.6.1 engineering concrete is used in the construction of concrete. 1) each pile is made of concrete blocks. 2) a pile of collapse is measured at least once. 3) the underwater concrete must be continuously constructed, and the time of each pile is controlled by the initial setting time of the initial concrete. Chapter ix the main construction method of the basement 9.1 order The excavation of the foundation pit, the excavation of the soil, the concrete pad layer, the waterproof construction, the construction of the concrete protective layer of fine stone concrete, the foundation, and the steel of the base plate The reinforcement of the band, the base plate, the foundation concrete, the concrete wall, the column reinforcement and the erection of the installation Go to the concrete wall, the wall of the column

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档