- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工计算书--叠浇高跨右(国外英文资料)
施工计算书--叠浇高跨右(国外英文资料)
Wang yuanyuan: installation of single-tier industrial plant structure
First, the general situation of the project
The metal workshop of a light industrial machinery factory has a size of 6 meters in length and 108 meters in length and 42 meters in width. The assembly structure of the assembled reinforced concrete frame is adopted. The lower straddle is 8.40 meters high, with a span of 18 meters, with a 5T rail and a 6m-high track. The height is 11.10 meters high, with a span of 24 meters, with a 10T girder, and an altitude of 8.4 meters. High span has skylight.
The construction plane and section are shown in figure 1.
The column is made of precast concrete and concrete i-section column, concrete is C30.
Adopt t-shaped concrete crane girder and prestressed large roof slab.
4, the frame adopts the prestressed concrete trapezoid roof frame. For the C40 concrete.
Use ordinary reinforced concrete foundation beams and contact beams.
Construction conditions
1, the construction site has been three-way, the basic project has been completed; The site of the construction site is clay. Its foundation capacity is 20T/m2.
2, the construction unit has two lifting equipment for use. A W1-100. The other one is w1-200, and its lifting performance is appendix 1.
3, the production of structures: requirements column, roof precast at the scene, the rest of the contact component such as crane beam, beam, large roof panel and foundation beam in 5 kilometers away from the scene file can be produced, used car shipped to the site.
The manpower, materials and equipment required for the construction site may be satisfied by design.
The period of construction: the main body structure is installed, and the construction period is set in July, 2011 as in August, for two months. During the period of construction the most thermidor average temperature 27.3 ℃, extreme maximum temperature is 39 ℃.
The structure installation quota is in appendix 2.
See appendix 3 for the strength of
您可能关注的文档
最近下载
- 中毒病人的急救与护理.pptx VIP
- 部编版小学六年级语文上册第七单元每课课后作业及答案汇编(含四套题).pdf VIP
- XXX斜拉桥监理实施细则.pdf VIP
- 技嘉主板B660M GAMING AC DDR4 (rev.1.x)用户手册简体中文(版本 1102).pdf
- 2025年秋季开学第一课精品课件.pptx
- 人教版七年级上册英语Unit 4知识点梳理及语法讲义.pdf VIP
- 人教版七年级上册英语Unit4知识点梳理及语法讲义(学生版).pdf VIP
- 斜拉桥特大桥监理细则.pptx
- 部编版小学六年级上册全册心理健康教育教案.pdf VIP
- 硼中子俘获治疗技术及应用.pptx VIP
文档评论(0)