- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织与管理_复习思考题_参答(国外英文资料)
施工组织与管理_复习思考题_参答(国外英文资料)
Project management review questions
Construction organization and management review the question
One, fill-in-the-blanks?
1. The construction procedures generally include,,,,, five stages.
The design of the construction organization is divided into three types according to the object.
The main parameters of the flow construction include, three types.
The construction preparation of the project is usually included,
This is the core of the preparation.
The analysis of raw data mainly includes the construction area and the two aspects.
6. The water construction time parameters including,,,,,, etc. Five.
The construction flow of adornment project is used commonly, 3 kinds.
8. The unit engineering must abide by,,,, construction procedures.
9. Engineering data refers to the natural conditions:,,,,.
The construction organization design is the important, the document that the building engineering organization construction.
The conditions for the construction of water construction should be.
The basis for determining the sequence of engineering construction is,.
The main task of the feasibility study is to establish or modify a construction project
Technically, is it economically, economically, financially?
The flow of water is organized by the method of organizing the flow of water.
The basic order in which the unit construction should be followed is,.
During the design of the unit engineering construction organization, the construction profile and the construction characteristics are analyzed
Yes, yes.
The expression method of network graph is generally divided into and.
? Second, single choice question
1, the object of the design of the unit construction organization is ()
A. project b. project c. project d. branch engineering
Which of the following is an investigation of the economic condition of the engineering technology?
A. The geological survey of the project
The biggest difference between a double code network diagram and a single codename n
您可能关注的文档
最近下载
- 捕歼战斗中地排教案设计.doc VIP
- 深圳希莱恒电解质说明书.doc VIP
- 开展体育领域突出问题专项整治工作情况汇报.docx VIP
- 学校安全生产风险分级管控和隐患排查治理双重预防体系建设实施指南.pdf VIP
- 双眼视异常分析临床处理2020.pptx VIP
- 排捕歼战斗连贯演练.docx VIP
- Illustrator教程Illustrator绘图技巧Illustrator经典实例Illustrator网格工具绘制逼真花瓣.pdf VIP
- 民企混改公司合作协议书10篇.docx VIP
- 如何免费申请QQ号申请qq号方法.docx VIP
- Illustrator进阶技巧.pdf VIP
文档评论(0)