- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土工程工程量计算(国外英文资料)
混凝土工程工程量计算(国外英文资料)
Chapter v construction of concrete
instructions
The concrete components of this chapter are divided into three parts: self-mixing concrete parts, concrete pump parts and non-pump parts
The parts include the present water casting, the site prefabrication, the prefabrication of the processing plant, the structure and so on.
2, the concrete stone grain is determined: the design has the regulation according to the design, no design regulation presses the table regulation to calculate:
Pebble grain of the
Component name
5 ~ 16 mm
Prefabricated parts and prefabricated small components
5-31.5 mm
Casting member: rectangular column (except for the column of composition), cylinder, polygon column (L, T, + column except), frame
Beam, single beam, continuous beam, basement waterproof concrete wall
Precast member: column, beam, pile
5 ~ 20 mm
All of the above components are used in this particle size.
5 ~ 40 mm
Basic bedding, various foundations, roads, retaining walls, basement walls, large concrete
Note: this regulation also applies to other parts.
The amount of gross stone in the rubble concrete is calculated by 15%, if not at the same time, the ratio of the amount of rubble and concrete can be reduced to the other.
Four, the present water column, the inside of the wall of the inside of the wall is all according to the regulation to consider the bottom to set the dosage of the cement mortar.
The artificial days of the column, beams, walls, and plates (all kinds of plates), which are more than 8m high, are multiplied by the following coefficients: the net height is 1.18 in 12m. The net height is 1.25 in 18m.
The on-site prefabricated components, such as the fabrication of the processing plant, the concrete mixing ratio is calculated according to the processing plant. The processing plant and the concrete are made in the field. No adjustment of the construction and machinery.
Seven, processing components, other materials have been considered the cost of addin
您可能关注的文档
最近下载
- 人教部编版四年级数学上册《角的度量(全章)》PPT教学课件.ppt VIP
- 2024年贵州省六盘水市中考语文试卷真题(含答案逐题解析).docx
- 121全等三角形公开课课件.pptx VIP
- 加气混凝土砌块施工技术技术交底.pdf VIP
- qc080000内部质量审核查检表.doc VIP
- 2024中国邮政邮储银行秋招历年考试试题及答案.docx VIP
- 统编版(部编版)小学语文三年级上册第二单元单元测试卷(含答案).pdf VIP
- (高清版)DB62∕T 25-3111-2016 建筑基坑工程技术规程.pdf VIP
- 电力系统暂态解析.pdf VIP
- 统编版(2024)道德与法治小学三年级上册《10 公共场所,文明言行》教学设计.docx VIP
文档评论(0)