- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
03定额罕见题目解答汇总(国外英文资料)
03定额常见问题解答汇总(国外英文资料)
The answers to the FAQ are summarized
Q: how is the amount of construction of the heavy rain due to the column supported?
A: in the quota, the concrete can be measured in cubic meters according to the graphical dimensions, and the corresponding quota is applied. But from a reasonable point of view, it is advisable to apply the quota according to beam and plate.
Q: how do you carry out the quota for the flat plate or outdoor corridor that is outside the current water frame?
Answer: according to beam, board or have beam board to apply the corresponding quota.
Q: can the basement calculate the cost of off-foot?
A: the basement area can be included in the integrated scaffold.
Q: how do the manchu foundation with dark beams properly apply quotas?
Answer: still apply manchu base, the steel bar is calculated according to the construction diagram.
Q: how do you calculate the cost of mechanical access using the mixed structural engineering of the derrick?
Answer: the well frame is not a large machine, so no matter the mechanical entrance fee.
Q: when the class of two kinds of hoisting machinery enters the field, the ground base of the class is reinforced processing or piling and so on, how to plan the cost?
Answer: this cost is the construction measure fee, by the construction unit oneself calculate, can refer to the relevant quota or experience computation.
Q: bamboo plywood is used instead of steel plate in construction. Can you adjust it?
8 a:.
Q: how do you calculate the area of the concave balcony?
Answer: concave balcony area is in half (no guard).
Q: how will the cost of the machine be adjusted? Is the adjustment of mechanical fee to be calculated directly?
Answer: according to the provincial quota system (the zhejiang standard appendix has the relevant to the fees), the direct fees can be included.Q: how should the elevator shaft be calculated? How to calculate the cost of foot in the domestic project?
Answer: it is included in the integrated sc
您可能关注的文档
最近下载
- 2025教资科目二教育知识与能力必背简答题汇总.pdf VIP
- 2025广东江门市江海区建设工程质量检测站合同制工作人员招聘5人笔试备考试题及答案解析.docx VIP
- 护理学科建设与发展 ppt.pptx
- 教资高中英语知识点总结.pdf VIP
- 智能供应链优化项目启动会PPT模板2025流程节点演示方案.pptx VIP
- 六年级数学《数与代数》教学设计.pdf VIP
- 居住空间设计(项目式)全套PPT课件.pptx
- 中联TC7530-16H塔吊使用说明书.pdf VIP
- 商务秘书实务案例.docx VIP
- 2025广东江门市江海区建设工程质量检测站合同制工作人员招聘5人笔试参考题库附答案解析.docx VIP
文档评论(0)