业主方项目管理任务描述(国外英文资料).docVIP

业主方项目管理任务描述(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
业主方项目管理任务描述(国外英文资料)

业主方项目管理任务描述(国外英文资料) A case description of the owners project management mission Residential area project owner party in five stages of project management tasks in the design stage, design stage, before bidding, construction stage, preparation stage and the warranty period before use, do not include safety management 】 a detailed description of: Design the project management task The investment control of the preparation stage of the design On the basis of feasibility study, the analysis and the demonstration of the total investment objectives of the project; To formulate the preliminary plans for the general investment analysis of the project; To analyze the risks of the overall investment objectives and formulate the preliminary plans for investment risk management; To write the contents of investment control in the design appointment book; To propose investment evaluation Suggestions for the design scheme; To review the total investment estimates of the project according to the selected design scheme; To formulate the plan for the use of funds in the design phase and control its execution; To prepare all kinds of investment control reports and reports. The process control of the design preparation phase To analyze and demonstrate the overall progress goals; To compile the overall schedule of the project; To analyze the risks of the overall progress goals and prepare the preliminary plan for the risk management of the schedule; Audit the design schedule and control its execution; To write the content of progress control in the design appointment book; To prepare reports and reports for various progress. Quality control in the preparation phase of the design To understand the requirements of the owner, analyze and demonstrate the function of the project; Assist the owner to determine the quality requirements and standards of the project; To analyze the risks of quality targets and formulate preliminary plans for quality risk management; The functional description of

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档