xx隧道斜井转入正洞施工方案2(国外英文资料).docVIP

xx隧道斜井转入正洞施工方案2(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
xx隧道斜井转入正洞施工方案2(国外英文资料)

xx隧道斜井转入正洞施工方案2(国外英文资料) The slope of the ramp is reinforced by 3 parallel I20a, which is supported by the hole steel frame. In order to ensure that the steel frame of the zhengdong hole is secured, the I20a steel girder is set up by the inclined well and the positive hole, and the torang is welded with 3 pieces of the I20a steel frame. The upright steel frame falls on the tori beam and welded together with the torliang, the arch space is 1 f / 1.0 m, processing 11. The beams of the intersection are arranged as follows. To connect the beam with the inclined shaft The arch of the steel frame of the hole is set up with the anchor pipe, and four (two) of four (two) of four (two) long, four meters of phi 42 lock anchor pipe are set to secure the arch. (3) slope longitudinal tie to the hole is 1 m, and is hole steel or longitudinal rod welding is firm, are inclined to reach hole lead small catheter with steel welding is hole (small catheter spare parts cut). (4) are deviated well and hole intersect between beam and steel using I16 steel support column welded together, I16 between steel support column distance of 1.0 m (with steel frame is hole spacing), steel on steel support is hole on the top on the beam, the concrete arrangement is as follows: The torang is connected to the steel frame and steel support. Connect the bridge to the steel frame of the bridge (3) strengthening the construction of the hole Fellowship with inclined hole is strengthen DK318 + 570 ~ DK318 + 630 section 60 m range, practical for Ⅱ level of surrounding rock, according to the design level of a reduced grade Ⅲ rubber-sealing belt of surrounding rock is adopted to improve the supporting, including slope fellowship with positive hole range from 1 m on each side add I20a steel support. Support parameters: DK318 + 597 ~ 1) is hole DK318 + 606 section range I20a steel frame, the span 1.0 m, with 22 longitudinal connection between steel bar welded together, tie rod ring to the spacing of 1 m, steel fra

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档