- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
叠水盘花岗岩雕刻合同(国外英文资料)
叠水盘花岗岩雕刻合同(国外英文资料)
synthea
Party a: heilongjiang shimma real estate development co., LTD
The contractor (party b) : the city of Harbin, the city of the city of the city of the city of the city of the city of the city of the city of the art of the art of the art of the art of the art of the
In accordance with the contract law of the Peoples Republic of China and the provisions of the regulations on the construction and installation engineering contract, combined with granite carving details folding water, the two sides reach the following agreement:
One, the project summary:
The name of the project: the granite carving of the wutong bay
Location of the project: the wu-tong bay area of tianjin street, limin development zone of Harbin city
Construction period: this project started on May 7, 2009 and is completed on July 7, 2009, without rain or snow.
Quality of engineering: in the form of drawings and effects of party a, the quality of the work is engraved.
The contract price (capital of the renminbi) is 810,000 yuan (ie, 80,000 yuan), (no invoice).
Payment method: party a will pay 25% of the project to party b on the date of signing the contract. After the completion of the project, 65% of the project will be paid to party b, and the remaining 10% will be left for quality retention money, which will be paid to party b a year later.
Party a:
Before start working, provide to party b the construction drawings or practice shows that two copies of the confirmed, during the period of construction to provide to party b the construction required water, electricity, installation, operation, removal of obstacles affecting construction, and is responsible for the 300 mm base welding and concrete matters, to improve the quality of work, party a can be assigned to technical personnel supervision on a regular basis.
The work of party b:
According to the construction drawings or effect drawings provided by party a, responsible for stone material, artificial carving, transportation