- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国网电力职称英语补全短文2016版
Passage1 Functions of power transmission输电的功能——P45The function of C:power transmission is to send power from power plants to load center or to exchange power between networks in order to attain the generation-consumption balance or the supply-demand balance betweenE:power networks. Power transmission is completed by step-up substations,A:step-down substations and connected transmission equipment. The transmission line mainly consists of the transmission conductors (cables),poles or towers, insulators, overhead ground wires, and grounding devices. The D:transmission at high voltage can reduce the line loss and the voltage drop, ensure the power quality, raise the economy of B:power network operation. The increase of transmission line voltage can not only raise the amount of transmitted power, but also reduce the line loss and line voltage drop, and improve the voltage quality.C:动力传递的功能是将来自发电厂的电力输送到负载中心或进行电网之间的电力交换,以达到发电和用电或E:电网之间的供需平衡。动力传递是通过升压变电站、A:降压变电站和连接的传输设备完成。传输线主要由传输导体(线),杆塔,绝缘子,架空地线和接地装置等组成。采用D:传输在高电压可以降低线路损耗和电压降,保证电源质量,提高B:电网运行经济性。传输线电压的增加,不仅可以提高发送功率的量,同时也减少了线路损耗和线路压降,并提高电压质量。Passage 2 Substation misoperation and its preventing变电站的误操作及预防P55The misoperation that can lead toC:accidents in the electrical operation of the substation mainly are: ①on-load switching of isolating switch; ②connecting E:the grounding wire (closing the grounding switch) with power on; ③closing the circuit breaker (isolating switch)with ground lines (ground switch) earthed.The “five preventings” for A:preventing the misoperation in substation includes: ①preventing the wrong opening or closing of circuit breaker; ②preventing the on load opening and closing of isolating switch; ③ preventing B:the closing of grounding switch with power on;④preventing the closing of circuit breaker with grounding wire connected; ⑤preventingD:the persons from illegal entering the lived bay.可能导致误操作C:在变电站的电气操作事故,主要有:①带负荷拉合开关; ②E:带电挂接地线(合接地开关); ③合断路器(隔离开关)与接地的接地线(接地开关)。“五防”为A:防止误操作的变电站包括:①防止错误打开或关闭断路器; ②防止的负荷启闭
您可能关注的文档
- 教师中级职称英语试题7.doc
- 外贸英语函电第3章:Enquiry.ppt
- 职称英语习题第三套.doc
- 人教版小学数学第九册教学内容、重点及教学目标.doc
- 中英合作商务英语讲解1.ppt
- 如何做案例分析.ppt
- 2011职称英语综合阅读.doc
- 美国AASHTO LRFD 桥梁规范历史和目前现状.ppt
- 剑桥商务英语7.2A.ppt
- 人寿保险合同案例分析.ppt
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)