某医院综合大楼设计毕业设计正文.docVIP

  • 3
  • 0
  • 约5.18万字
  • 约 71页
  • 2017-06-08 发布于湖北
  • 举报
某医院综合大楼设计毕业设计正文剖析

摘 要 本设计为山东省潍坊市某医院的综合楼建筑及结构设计,建筑层数为十六层,属高层建筑设计范畴,结构体系采用框架-剪力墙结构体系。 开始部分为方案说明。包括设计资料、建筑方案、结构布置、构件截面初选,荷载导算。 第二部分为结构主体设计。考虑与实际工程相结合,这部分采用PKPM程序进行结构模型设计,结构内力分析及构件的配筋设计和施工图绘制。 第三步分为该工程相应的施工组织设计。 最后部分为英文资料翻译以及参考文献。英文资料主要探讨了框架-剪力墙联合结构体系在静力载荷作用下的可靠性分析方法。 书后附有图纸七张,分别为:标准层平面图、立面图、剖面图、剪力墙配筋图、楼板配筋图、柱配筋图、梁配筋图。 关键词:框架; 剪力墙;协同工作;软件PKPM;配筋 ABSTRACT This design is about a synthesized building of one hospital in WeiFangShi in ShanDong province. The design includes architectural collocation and structural design. The building layer count to 16 layers, belonging to high building designs category, uses the frame-shear wall structure system. Chapter one is the introduction of the project, including, total information, architectural design, plane surface arrangement, structure size selection, load calculation. Chapter two is structural design. Considering the way to connect this design to our actual work, the structural design is finished with software PKPM, including the structure inter-force analyze, the allot reinforcement and drawing the construction drawings. Chapter three is construction design of organization. The last part includes translation and primary bibliography. The English thesis analyzes the reliability of frame and shear wall structural systems under static loading. There are seven drawings attached to the explanation of this design, including the standard floor plane drawing, the vertical plane drawing, the section plane drawing, the shear wall reinforced drawing, the standard concrete plate reinforced drawing and the construction drawing of beams and columns. Key words: Frame; shear wall; coordination; PKPM; reinforce 目 录 第一章 建筑设计…………………………………………………1 1.1工程概况…………………………………………………………1 1.2构造做法…………………………………………………………1 1.3平面布置…………………………………………………………2 第二章 结构设计…………………………………………………2 2.1 结构方案………………………………………………………2 2.2结构分层重力荷载……………………………………………6 2.3用PKPM进行电算………………………………………………9 第三章 施工组织设计…………………………………………25 3.1工程概况………………………………………………………25 3.2施工方案部署…………………………………………………26 3.3施工准备…………

文档评论(0)

1亿VIP精品文档

相关文档