- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型水厂泵站设计规范——最终稿(国外英文资料)
大型水厂泵站设计规范——最终稿(国外英文资料)
Code for design of pumping station of large water plant (A Edition) SL/GLZ7.5-51-2010
Qingdao Sanli Group Co., Ltd. enterprise standard
Code for design of pumping station of large water plant (A Edition) SL/GLZ7.5-51-2010
1 Purpose
In order to standardize the design process of pumping station equipment (hereinafter referred to as large pumping station or pumping station), and improve the quality of pumping station design in large waterworks, this specification is formulated.
2 scope of application
The whole process of the application of various specifications of large pumping stations in three foreign companies bear the pre-sale contract scheme selection, design, production, delivery, installation and commissioning etc..
3 terms
Large pumping station: water pump at 3 units (including 3 units) above, and each pump power at 45kW (including 45kW) more than water supply equipment.
Wireless monitoring: wireless surveillance is the monitoring system that uses no radio to transmit video, data and other signals without wiring.
4 responsibilities
Review the preliminary assessment of 4.1 marketing company responsible for the large pumping station design, selection and pre-sale contract design relates to the on-site technical parameters data acquisition, contract and departments to implement and feedback, on-site technical parameters collection (general salesman or regional technical support) is responsible for the integrity and accuracy of the technical parameters of the acquired.
4.2 planning department is responsible for the delivery of related plans for large-scale pumping stations and the supervision and management of the implementation of the plan.
4.3 R D centers are responsible for the evaluation of large pumping stations, direct and direct participation in the design of some special pumping stations.
4.4, the engineering department is responsible for the evaluation of large pumping stations, contract design, technical information and technical
您可能关注的文档
最近下载
- ISO27001-2022信息安全管理体系内审全套记录表格.pdf VIP
- 六大纪律违纪风险点排查及对应防控措施.docx VIP
- 2022-2023学年天津市部分区高二(下)期末物理试卷(含解析).docx
- AQT9009-2015《生产安全事故应急演练评估规范》(AQT 9009-2015).pdf
- 预防艾滋病、梅毒和乙肝母婴传播登记及随访表.docx
- 园区保洁服务方案.docx
- DB-13 T 886-2007 森林害鼠预测预报与防治技术规程.pdf
- 关于新形势下党内政治生活的若干准则解读幻灯课件.pptx VIP
- SL101-2014水工钢闸门和启闭机安全检测技术规程.docx VIP
- 辽宁市政道路(桥梁)维修养护工程施工组织设计.doc
文档评论(0)