大型水厂泵站设计规范——最终稿(国外英文资料).doc

大型水厂泵站设计规范——最终稿(国外英文资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型水厂泵站设计规范——最终稿(国外英文资料)

大型水厂泵站设计规范——最终稿(国外英文资料) Code for design of pumping station of large water plant (A Edition) SL/GLZ7.5-51-2010 Qingdao Sanli Group Co., Ltd. enterprise standard Code for design of pumping station of large water plant (A Edition) SL/GLZ7.5-51-2010 1 Purpose In order to standardize the design process of pumping station equipment (hereinafter referred to as large pumping station or pumping station), and improve the quality of pumping station design in large waterworks, this specification is formulated. 2 scope of application The whole process of the application of various specifications of large pumping stations in three foreign companies bear the pre-sale contract scheme selection, design, production, delivery, installation and commissioning etc.. 3 terms Large pumping station: water pump at 3 units (including 3 units) above, and each pump power at 45kW (including 45kW) more than water supply equipment. Wireless monitoring: wireless surveillance is the monitoring system that uses no radio to transmit video, data and other signals without wiring. 4 responsibilities Review the preliminary assessment of 4.1 marketing company responsible for the large pumping station design, selection and pre-sale contract design relates to the on-site technical parameters data acquisition, contract and departments to implement and feedback, on-site technical parameters collection (general salesman or regional technical support) is responsible for the integrity and accuracy of the technical parameters of the acquired. 4.2 planning department is responsible for the delivery of related plans for large-scale pumping stations and the supervision and management of the implementation of the plan. 4.3 R D centers are responsible for the evaluation of large pumping stations, direct and direct participation in the design of some special pumping stations. 4.4, the engineering department is responsible for the evaluation of large pumping stations, contract design, technical information and technical

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档