- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
环锚预应力混凝土衬砌结构锚具槽区域的应力状态分析论文
ABSTRACT
The pre-stressed tunnel lining with unbounded circular anchored tendons is a new
structure applying in hydraulic tunnel. This structure is mainly applied in the
hydraulic tunnel which is in the poor geological conditions of surrounding rock, has
high water pressure, and leads to the slope instability of the surrounding buildings
because of the water infiltrating the rock. The pre-stressed tunnel lining with
unbounded circular anchored tendons has its special advantages as a new form of
lining structure: The steel strand in the unbounded lining is double circle, which can
make the distribution of compressive stress in lining more uniform and can also
reduce the loss of the stress along the path. Compared with the bounded lining, it has
larger effective press, and it can reduce the thickness of the concrete lining. In this
way, it can save more material and reduce the excavated volume. Above all, it can
also greatly reduce the difficulty of the construction, the cost of engineering, and
effectively speed up the progress of construction. In view of the advantage of
unbonded prestressed concrete lining, it can be seen that the structure has a broad
application prospect in the hydraulic tunnel in our country. At present, this kind of
concrete lining is only applied in Xiaolangdi Project and Dahuofang water tunnel. The
structure also exposes some problems at the point of the operation of the two projects,
especially the area of boxout. Through the observation of the Xiaolangdi project, the
area of boxout has the problem of oil leakage, it is the weakest part of the whole
structure.
This paper makes the model of NO.2 tunnel o
您可能关注的文档
最近下载
- 国开04018_管理英语2-机考复习资料.docx VIP
- 人音版七年级上册《第五单元 草原牧歌》大单元整体教学设计.docx
- 物业各岗位职责.docx VIP
- 聚丙烯腈纤维介绍.ppt VIP
- 湖北工业大学2024-2025学年第1学期《高等数学(上)》期末考试试卷(B卷)附参考答案.pdf
- YST420-2023 铝合金韦氏硬度试验方法.pdf VIP
- 2025海南三亚市中医院(考核)招聘员额制和事业编人员137人(第1号)历年真题库及答案解析(夺冠).docx VIP
- 工业管道安全技术规程.docx VIP
- 三维激光扫描应用技术研究.pptx VIP
- 大澳湾海岸带保护修复工程环评报告.pdf
原创力文档


文档评论(0)