大跨度门式刚架结构吊装工法(国外英语资料)

大跨度门式刚架结构吊装工法(国外英语资料) Hoisting method of large span portal frame structure (JSGF14-2001) 1, scope of application The construction method is suitable for the erection of double hinged reinforced concrete portal frame structures, such as different span, adjustable height of support, steel wire rope, clasp and lifting machinery, and also can be applied to the construction of this method. 2 、 construction preparation 2.1 familiar goes, learning standard, master portal frame hoisting requirement. 2.2, calculate the height of the bracket, before the approach to the erection of the bracket leveling, maintain the same level and prefabricated parts of the site, avoid the stent position. 2.3 on site conditions, namely the cup bottom level, flatness, smoothness and bracket position, axis, prefabricated frame column length, node structure of itemized acceptance inspection site, precast concrete strength, establish the corresponding construction programs. 2.4 conduct technical and safety clarification in accordance with design requirements, quality standards, specifications, and established plans. 2.5, seriously analyze the site conditions and rigid frame column, herringbone beam production situation, the quality problems may arise into the analysis, organize key research, formulate preventive measures. 3, process flow Check the bottom of the cup, cup and elevation elastic component installation, center line frame column and beam and plane displacement, Qimo frame column connections for hanging into the cup, to set up support, correction, symmetrical frame column verticality stopper into the cup to set up another bracket, plug, and verticality correction middle small, articulated beam hoisting installation welding. 4, construction operation points 4.1 material selection and production of special tools: 4.1.1 frame column mould, steel wire rope with 6? 9 (phi 24.5), according to the position of the rings, in accordance with the straight after the frame column in a vertical tilt

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档