工程量清单及预算控制价评审的重难点及解决办法(国外英文资料).docVIP

工程量清单及预算控制价评审的重难点及解决办法(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程量清单及预算控制价评审的重难点及解决办法(国外英文资料)

工程量清单及预算控制价评审的重难点及解决办法(国外英文资料)The necessity of the evaluation of the quantity of the projectBill of quantities is the performance of the proposed project of the partial project, measures and other project name and corresponding number list, is an important part of the tender documents, is the main basis, whose budget control price, is the main basis of tender offer in bidding for construction, is part of the construction contract, and to adjust quantities, or review the pay project cost, completion settlement and solve the construction of the differences and disputes, claim. So to control the budget price evaluation work, must first review the bill of quantities, if only to control the budget price review, or too late, the wasted effort.Review of the quantity of project quantity(1) review the project code, project name, unit of measurement and quantity of engineering in the project quantity list1, according to the work drawing and the pricing code, the appendix and the selected item codes are not correct; The project name of the project is the same as the project name of the project. For projects that specify a number of units in the pricing code, check the number of units in the list to be consistent with the amount of engineering. And so on.Reasonable division of the name of the project, check for omission, multi-column or duplicate list items. According to code, technical specification, standard atlas, construction drawing, according to the engineering structure, the construction site and the use of material and specifications, reasonable division and list the project name. In general, a single column in the base layer; In the case of the complex roof, the insulation, waterproof, and the decorative coating of the block are usually included. Also check for missing items, multi-column or duplicate list items, such as the constant leakage of steel and steel bars in the volume list. Another situation is when prepare the bill of quantities, some engineers did not smok

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档