斜拉桥三维仿真分析(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
斜拉桥三维仿真分析(国外英文资料)

斜拉桥三维仿真分析(国外英文资料) 1 / filname, cable - stayed bridge Keyw, pr_struc, 1 / prep7 ! Defining unit type Et, 1, beam4 Et, 2, link10 ! Define material properties Mp, ex, 1,3.5e10 Mp, 1,0.17 prxy, Mp, dens, 1250 Mp, ex, 2, 10 e15 Mp, prxy, 2, 0 Mp, dens, 2, 0 Mp, ex, 3,1.9e10 Mp, prxy, 3,0.25 Mp, dens, 3120 Mp, damp, 3,0.5 ! Define the real constant ! Define the real constant R, 1, 25.6, 5.546.133, 16 1.6 R, 2, 16, 29.417, 15.394, 3.4, 4.7 R, 3, 54,364.5, 162, 6, 9 R, 4, 40, 213.3, 83.3, 5, 8 R, 5, 1, 1/12, 1/12, 1 R, 6, 0.012, 0.012! The rope ! Create nodes and units ! Establish the main beam node / view, 1,1,1,1 / Angle, 1270, xm, 0 / replot * do, I, 1, 59! This loop is used to establish a semi-cross node of the main beam X = -174 * 2 + (I - 1) * 6! The leftmost x is 174 times 2, x equals 0, the left-hand side of x is equal to 6 Y1 = -14! The bridge is 28 meters wide, so the left-hand side is -14 Y2 is equal to 14 factorial. The bridge is 28 meters wide, so the right-hand side is 14 N, 3 times I minus 1 plus 1, x! Establish the main beam node 3 * (I - 1) + 1 for the node number N, 3 times I minus 1 plus 2, x, y1! The following two lines establish the nodes on both sides of the bridge N, 3 times I, x, y2! The absolute programmer who can come up with this modeling command is, haha * enddo! You can completely set up the three nodes in the end, and then use these three nodes to replicate 59 in the x direction, with a spacing of 6 ! Build the main beam unit The type, 1 Real, 1 Mat, 1 * do, I, 1, 1! The following circulation establishes the main girder unit of the bridge J is equal to 3 times I minus 1 plus 1 E, j, j + 3 * enddo ! Build a barbed beam The type, 1 Real, 5 Mat, 2 * do, I, 159,1! The following loops are used to establish the nodes of the bridges barbed beams J is equal to 3 times I minus 1 plus 1 J1 is 3 times I minus 1 plus 2 J2 = 3 * I E, j, j1 E, j, j2 * enddo ! Build a half-span tower I = 59 * 3! The variable is used to record the number of nodes in the bridge

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档