- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
论工程变更与造价控制(国外英文资料)
论工程变更与造价控制(国外英文资料)
There are only two things I can do in my life: it wont, nor will it. They have background, and I have a shadow. The ideal of meat, the life of cabbage. The ideal of meat, the life of cabbage. White horse, where are you dead? You have lost the prince and dare not come to see me. Engineering change and cost control
This paper analyzes the influencing factors of engineering change, introduces the management and processing principle of engineering change, and discusses the cost control of the engineering change for reference.
Keyword engineering changes; Influencing factors; Management; Principles of management; Cost control
Due to project the work for pre-project conditions, often appear in the implementation of some actual situation didnt agree with the original design file and found that the original design errors, omissions or other objective factors to change the original design scheme, structure, quantity, or adjust the working content of the original contract, this leads to engineering change. As long as there is the case in the project, the construction of the parties involved any party (including the owner, supervision engineer, the contractor and design) are accordingly put forward the engineering change. Any engineering change is bound to affect the normal construction project operation, will have an effect on schedule, cost, cost, increase the project investment, thus affect the project investor returns. Therefore, the project changes will directly increase the investment in the project, make the investment out of control, and make the investment benefit of the construction project affected. Frequent engineering change will increase and disrupt the normal work of the owner and the contractor steps and content, also can increase the workload of the organization and coordination of the supervision engineer, is unfavorable to contract management and quality control, increase the difficulty and complexity of project management, and indirectly